Home > NRC Library > ADAMS Public Documents
Forwards Suppl 1 to amend applications 116 & 100 to licenses NPF-10 & NPF-15,respectively,consisting of proposed TS change 407 changing SR 4.7.5.b to run control room emergency air cleanup sys every 31 days from 10 h to 2 h.
Accession Number: ML20095G861
Date Released: Saturday, April 18, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20095G857 - Forwards Suppl 1 to amend applications 116 & 100 to licenses NPF-10 & NPF-15,respectively,consisting of proposed TS change 407 changing SR 4.7.5.b to run control room emergency air cleanup sys every 31 days from 10 h to 2 h. (2 page(s), 12/18/1995)
- ML20095G862 - Suppl 1 to amend applications 116 & 100 to licenses NPF-10 & NPF-15,consisting of proposed TS change 407 changing SR 4.7.5.b to run control room emergency air cleanup sys every 31 days from 10 h to 2 h. (18 page(s), 12/18/1995)
- ML20095G865 - Proposed tech specs,changing SR 4.7.5.b to run control room emergency air cleanup sys every 31 days from 10 h to 2 h & air flow rate for control room emergency air cleanup sys AC unit from 35,485 cfm to 35,705 cfm. (69 page(s), 12/18/1995)
- ML20095G870 - "Relative Humidity at Charcoal Beds (E-418 & 419),no Heating." (15 page(s), 12/14/1995)
- ML20095G873 - "Evaporation Time of Entrapped Air Moisture in E-419." (15 page(s), 12/14/1995)