NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards summary of justifications for interim operation of Unit 1 pending completion of ice condenser drain test & multi-node containment analysis performed by Westinghouse. W/two oversize drawings.Aperture cards available in PDR.

Accession Number: ML20093B899

Date Released: Tuesday, September 29, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer