Home > NRC Library > ADAMS Public Documents
First partial response to FOIA request for documents.Records in App A encl & being made available in PDR.
Accession Number: ML20091F867
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20091N511 - First partial response to FOIA request for documents.Records in App A encl & being made available in PDR. (3 page(s), 5/2/1995)
- ML20091F927 - Forwards requests for addl info re AP600 SSAR,specifically in areas of equipment qualification,flood protection,missile protection,fire protection,fission product control sys,SF storage & cooling sys,waters sys & drainage sys. (30 page(s), 4/19/1994)
- ML20091G077 - Forwards DSER for Chapters 3 & 5 of AP600 SSAR input. (37 page(s), 8/31/1994)
- ML20091G167 - Forwards list of issues for consideration for inclusion in top 50 issues. (7 page(s), 12/15/1994)
- ML20091G178 - Requests review & comment on AP600 issues for enclosure in upcoming SECY paper.List of issues encl. (5 page(s), 1/26/1995)
- ML20091N534 - Forwards RAI that resulted from review of CESSAR-DC Sys 80+. Questions & comments associated w/USIs & GSIs re CESSAR-DC Sys 80+ also included. (60 page(s), 10/4/1991)
- ML20091N544 - Forwards RAIs on preliminary review of AP600 SSAR in areas of environ qualification,water sys,flood protection, habitability sys,fission product removal & control sys, radwaste mgt sys & containment sys. (11 page(s), 8/14/1992)
- ML20091F856 - Forwards staff input to FSER for Section 3.11 of Chapter 3 of CE Sys 80+ CESSAR re equipment qualification. (7 page(s), 12/1/1993)
- ML20091G115 - Forwards list of open items & addl questions to discuss w/W. SPLB proposes that list be sent to W as agenda for meeting to be held in Pittsburgh to discuss & resolve each issue if possible,or at least make concerns clear. (46 page(s), 9/30/1994)