Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents re allegation concerning Northeast Utils,Millstone & Connecticut Yankee nuclear power stations.Forwards App H & I records.App H records available in PDR.App I records withheld in part.
Accession Number: ML20091B258
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20091B354 - Partially withheld ltr re 900222 concerns re potential chilling effect on other supervisors due to statements about transfer in DOL concilation ltr.NRC will monitor licensee actions to ensure proper response. (5 page(s), 5/2/1990)
- ML20091B268 - Provides followup to 890714 memo re installation of telephones in area of cable tunnels (Security Doors 303 & 304).Benefit of installing telephones minimal since CO2 sys locked out prior to entry. (2 page(s), 4/4/1990)
- ML20091B291 - Advises of closeout of allegation RI-90-A-0032.Allegation unsubstantiated. (6 page(s), 7/24/1990)
- ML20091B299 - Partially withheld memo responding to 890620 allegation re wrongfull termination from employment as security guard based on failure to take addl training re working in areas protected by CO2 sys. (6 page(s), 7/7/1989)
- ML20091B343 - Partially withheld ltr re 891201 discussion concerning discrimination by utils. (1 page(s), 1/3/1990)
- ML20091B286 - Discusses 900110 allegation by employee re harassment & discrimination while performing duties. (5 page(s), 8/10/1990)
- ML20091B282 - Advises of closeout of allegation RI-89-A-0120. (3 page(s), 7/27/1990)
- ML20091B303 - Partially withheld ltr re allegation RI-89-A-0080. Allegation found partially substantiated & findings documented in encl insp rept 50-423/90-08 dtd 900703. (1 page(s), 7/27/1990)
- ML20091B334 - Partially withheld ltr re 891201 discussion w/NRC on discrimination by util. (1 page(s), 12/26/1989)
- ML20091B288 - Advises of closeout of allegation RI-90-A-0031 re util corporate engineer disagreement w/steam generator tube integrity assessment prepared on 900131. (17 page(s), 7/10/1990)