Home > NRC Library > ADAMS Public Documents
Forwards "Unit 2 Turbine Roll Milestone." NRC concurrence requested to pursue milestone.Release of portions of required sys contained in modules not currently released,but required to support milestone requested.
Accession Number: ML20080N276
Date Released: Saturday, October 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20080N273 - Forwards "Unit 2 Turbine Roll Milestone." NRC concurrence requested to pursue milestone.Release of portions of required sys contained in modules not currently released,but required to support milestone requested. (2 page(s), 2/15/1984)
- ML20080N286 - "Unit 2 Turbine Roll Milestone." W/eight oversize drawings. Aperture cards are available in PDR. (17 page(s), 2/29/1984)
- ML20263M249 - Marked-up "Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2." (1 page(s), 8/25/1983)
- ML20263M254 - Marked-up "Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2." (1 page(s), 8/25/1983)
- ML20263M258 - Marked-up "Hanger Isometric:High Pressure Steam to Evaporator Building." Sheet 1. (1 page(s), 7/14/1983)
- ML20263M261 - Marked-up "Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A." Sheet 2. (1 page(s), 2/15/1983)
- ML20263M269 - Marked-up "Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B." Sheet 3.Rev date illegible. (1 page(s), 2/15/1984)
- ML20263M270 - Marked-up "Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A." Sheet 2.Rev date illegible. (1 page(s), 2/15/1984)
- ML20263M273 - "Marked-up "Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B." Sheet 3. (1 page(s), 9/13/1983)
- ML20263M277 - "Unit 2 Turbine Roll Integrated Schedule." (1 page(s), 1/13/1984)