Home > NRC Library > ADAMS Public Documents
Application to amend Provisional OL DPR-21 for Reload 8/ Cycle 9.Proposed Tech Spec changes involve extended load line limit.Supporting documentation encl.
Accession Number: ML20065T661
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20065T659 - Application to amend Provisional OL DPR-21 for Reload 8/ Cycle 9.Proposed Tech Spec changes involve extended load line limit.Supporting documentation encl. (4 page(s), 10/15/1982)
- ML20065T680 - "Supplemental Reload Licensing Submittal for Millstone Unit 1,Reload 8." (17 page(s), 6/30/1982)
- ML20065T681 - Errata & addenda to "LOCA Analysis Rept." (6 page(s), 6/30/1982)
- ML20065T690 - "Extended Load Line Limit Analysis,Millstone Point Nuclear Power Station,Unit 1." (42 page(s), 6/30/1982)
- ML20065T696 - "Suppl 1 to Extended Load Line Limit Analysis,Millstone Point Nuclear Power Station Unit 1 (Reverification for Cycle 9)." (9 page(s), 6/30/1982)
- ML20065T710 - Proposed Tech Spec changes involving extended load line limit,protective instrumentation,initiating rod block instrumentation,special repts,containment sys,primary containment isolation & scram discharge sys. (55 page(s), 10/15/1982)