NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Braidwood Nuclear Station Unit 2 Third Refueling Outage (Mar-Apr 1993) SG ISI Results." During insp 50% of tubing received full length bobbin coil insp w/ remainder of tubes being inspected through U-Bend.

Accession Number: ML20065J732

Date Released: Thursday, March 19, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer