Home > NRC Library > ADAMS Public Documents
Forwards Amends 65,65 & 62 to Licenses DPR-38,DPR-47 & DPR-55,respectively,changing Tech Specs re full-rated power in Cycle 5 after core reload,removal of orifice rod assemblies & high pressure injection pump operation.
Accession Number: ML20064D417
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20064D412 - Forwards Amends 65,65 & 62 to Licenses DPR-38,DPR-47 & DPR-55,respectively,changing Tech Specs re full-rated power in Cycle 5 after core reload,removal of orifice rod assemblies & high pressure injection pump operation. (3 page(s), 10/23/1978)
- ML20064D422 - Amend 65 to License DPR-38,changing Tech Specs re full-rated power during Cycle 5 operation after core reload,removal of orifice rod assemblies from core & HPI pump operation. (2 page(s), 10/23/1978)
- ML20064D424 - Amend 65 to License DPR-47,changing Tech Specs re full-rated power during Cycle 5 operation after core reload,removal of orifice rod assemblies from core & HPI pump operation. (2 page(s), 10/23/1978)
- ML20064D428 - Amend 62 to License DPR-55,changing Tech Specs re full-rated power during Cycle 5 operation after core reload,removal of orifice rod assemblies from core & HPI pump operation. (25 page(s), 10/23/1978)
- ML20064D432 - Exemption from 10CFR50.46(a) re reactor cooling until mod complete or until next refueling shutdown. (8 page(s), 10/23/1978)
- ML20064D436 - Safety evaluation & EIA supporting Amend 65 to Lic DPR-38, Amend 65 to Lic DPR-47 & Amend 62 to Lic DPR-55.Concludes that it is acceptable for Cycle 5 oper to proceed & that EIA not req. (19 page(s), 10/23/1978)
- ML20064D441 - Notice of issuance of Amends 65,65 & 62 to Licenses DPR-38, DPR-47 & DPR-55,respectively. (2 page(s), 10/23/1978)