NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Amends 65,65 & 62 to Licenses DPR-38,DPR-47 & DPR-55,respectively,changing Tech Specs re full-rated power in Cycle 5 after core reload,removal of orifice rod assemblies & high pressure injection pump operation.

Accession Number: ML20064D417

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer