Home > NRC Library > ADAMS Public Documents
Forwards requested info re operator training & operating & emergency procedures for pressurized thermal shock.Submittal includes outline & lesson plan for reactor operator/senior reactor operator.
Accession Number: ML20053A183
Date Released: Saturday, March 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20053A182 - Forwards requested info re operator training & operating & emergency procedures for pressurized thermal shock.Submittal includes outline & lesson plan for reactor operator/senior reactor operator. (5 page(s), 5/17/1982)
- ML20053A193 - Revision 3 to Procedure OP-2-1, "Plant Startup from Cold Shutdown to Hot Standby." (1 page(s), 7/27/1973)
- ML20053A206 - Revision 2 to Procedure OP-6-1, "Hot Standby to Cold Condition." (1 page(s), 12/12/1972)
- ML20053A224 - Revision 5 to Procedure OP-8-1, "Reactor Shutdown." (3 page(s), 12/22/1978)
- ML20053A235 - Revision 22 to Procedure OI-RC-3-1, "RCS Startup." (8 page(s), 5/17/1982)
- ML20053A241 - Revision 29 to Procedure OI-RC-4-1, "RCS Normal Shutdown." (11 page(s), 5/17/1982)
- ML20053A252 - Revision 6 to Procedure OI-RC-7, "RCS Pressure Control." (6 page(s), 2/9/1978)
- ML20053A263 - Revision 17 to Procedure EP-5-1, "LOCA (PPLS Unblocked)." (10 page(s), 5/11/1982)
- ML20053A276 - Revision 14 to Procedure EP-6-1, "Uncontrolled Heat Extraction." (7 page(s), 5/11/1982)
- ML20053A287 - Revision 14 to Procedure EP-29-1, "Steam Line Rupture W/Complete Loss of Offsite AC Power." (8 page(s), 5/11/1982)
- ML20053A298 - Revision 15 to Procedure EP-30-1, "Steam Generator Tube Leak/Rupture (PPLS Unblocked)." (8 page(s), 5/11/1982)