Forwards LERs 82-029/03L-0,82-030/03L-0 & 82-031/03L-0.
Accession Number: ML20052E832
Date Released: Friday, March 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20052E831 - Forwards LERs 82-029/03L-0,82-030/03L-0 & 82-031/03L-0. (1 page(s), 4/29/1982)
- ML20052E835 - LER 82-029/03L-0:on 820330,during startup,steam generator 3 stop valve MRV-230 pillar stem wipers found displaced from bearing assemblies.Caused by nonparallel alignment of pillars.Split ring retainers fabricated & welded. (2 page(s), 4/29/1982)
- ML20052E842 - LER 82-030/03L-0:on 820401,both steam generator 1 stop valve dump valves were isolated at same time.Caused by incorrect orientation of selector valve MMO-210 during initial installation.MMO-210 will be reinstalled. (2 page(s), 4/29/1982)
- ML20052E847 - LER 82-031/03L-0:on 820330,during preventive maint insp,roll up fire door 314 would not close upon automatic closure activation.Caused by adjusting wheel rivets missing from automatic closure mechanism.Discharge spring adjusted. (2 page(s), 4/29/1982)