Home > NRC Library > ADAMS Public Documents
Forwards LERs 82-019/03L-0,82-017/03L-0 & 82-016/03L-0.
Accession Number: ML20049J469
Date Released: Tuesday, March 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20049J468 - Forwards LERs 82-019/03L-0,82-017/03L-0 & 82-016/03L-0. (1 page(s), 3/1/1982)
- ML20049J491 - LER 82-019/03L-0:on 820202,PT-27 revealed ampere readings for heat tracing circuits 24C,25A,panel 2 & circuit 24D, panels 1 & 2 (boron injection tank recirculation line) below acceptance criteria.Caused by loss of heat tracing. (2 page(s), 3/1/1982)
- ML20049J535 - LER 82-017/03L-0:on 820131,PR-27 revealed ampere readings for heat tracing panels 8 & 9,circuits 24A & C below acceptance criteria.Caused by loss of heat tracing due to excessive heat.Tracing replaced.Design change initiated. (2 page(s), 3/1/1982)
- ML20049J536 - LER 82-016/03L-0:on 820131,loss of boric acid flow to blender observed while attempting blend to vol control tank. Caused by loss of heat tracing & damaged insulation upstream of flow transmitter.Tracing replaced. (2 page(s), 3/1/1982)