Home > NRC Library > ADAMS Public Documents
Motion for summary disposition of Contentions 10 & 12.No genuine issue of matl fact exists & util entitled to favorable decision.
Accession Number: ML20039C190
Date Released: Saturday, February 22, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20039C189 - Motion for summary disposition of Contentions 10 & 12.No genuine issue of matl fact exists & util entitled to favorable decision. (6 page(s), 12/21/1981)
- ML20039C192 - Affidavit of JB Hoch re Joint Intervenors Contention 10. Pressurizer heaters & associated controls are not required to maintain natural circulation at hot standby conditions. (3 page(s), 12/21/1981)
- ML20039C193 - Affidavit of GG Harkness re RCPB.Pressure boundary of pressurizer not jeopardized by penetrations in pressure vessel for electrical connections to heaters.Prof qualifications encl. (2 page(s), 12/15/1981)
- ML20039C195 - Affidavit of GE Lang re operation & design of pressurizer heaters & associated controls.Facility design provides other methods of maintaining pressure control using sys designed to safety-grade requirements.Prof qualifications encl. (3 page(s), 12/15/1981)
- ML20039C196 - Affidavit of EM Burns re pressurizer power operated relief valves.Valves passed radiographic,liquid penetrant, hydrostatic & leak tests.Prof qualifications encl. (5 page(s), 12/15/1981)
- ML20039C200 - Affidavit of RT Skwarek re evaluations of postulated valve failures.In hypothetical case of pressurizer safety,relief & block valves failure,public health & safety would not be endangered.W/prof qualifications & Certificate of Svc. (5 page(s), 12/15/1981)