Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for correspondence to & from Northeast Utils & NRC on allegations of unsafe plant conditions.Forwards documents listed on App A.Addl records partially & completely withheld (ref FOIA Exemptions 6 & 7).
Accession Number: ML20035A875
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20035A897 - Responds to 910225 memo transmitting response to supervisor re performance appraisal & requested that NRC take action to evaluate response.Harassment allegations must be filed w/ Dept of Labor at listed address. (6 page(s), 5/13/1991)
- ML20035A881 - Advises of receipt of Allegations RI-91-A-0091,RI-91-A-0134, & RI-91-A-0029 re compliance w/GDC 17,employee discrimination & employee harassment,respectively. Insufficient info provided re potential harassment. (2 page(s), 7/30/1991)
- ML20035A887 - Responds to 901213 ltr containing questions on I&C Dept biennial procedure reviews & concerns w/maint practices associated w/main feedwater pump coupling tagout controls. NRC taking steps to address procedure compliance. (1 page(s), 10/11/1991)
- ML20035A900 - Responds to allegations that I&C technicians required to work excessive hours in support of 910217 plant startup following 910216 reactor scram. (7 page(s), 5/3/1991)
- ML20035A884 - Requests assistance in resolving concern,identified by util SSFI re compliance w/GDC 17 whereby single fault on onsite bus could cause simultaneous disruption of power to both redundant 4 KV Class 1E divs. (8 page(s), 5/20/1991)
- ML20035A878 - Requests results & disposition of Allegation RI-90-A-232 within 30 days of ltr date.Allegation delineated in encl. (11 page(s), 2/22/1991)
- ML20035A885 - Responds to questions posed to Region I re conclusions on issue of RPS matrix testing conducted at Unit 2 on 890922. Reinsp of RPS will be documented as part of Insp Rept 50-336/91-18.Memo re RPS testing encl. (5 page(s), 8/27/1991)
- ML20035A899 - Responds to allegations that I&C technicians required to work excessive hours in support of facility startup on 910217 & that technician insufficiently trained on surveillance procedure.Util response to concerns encl. (1 page(s), 7/22/1991)