Forwards 44 drawings,info & procedures,in response to NRC 801222 request for review re controls for handling heavy loads per NUREG-0612.Aperture cards are available in PDR.
Accession Number: ML20005B628
Date Released: Saturday, October 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20005B627 - Forwards 44 drawings,info & procedures,in response to NRC 801222 request for review re controls for handling heavy loads per NUREG-0612.Aperture cards are available in PDR. (115 page(s), 6/18/1981)
- ML20005B637 - "Procedure for Training of Const Div Craft Personnel." (10 page(s), 6/15/1978)
- ML20005B639 - "Procedure for Certification of Inspectors of Handling Equipment & Rigging." (18 page(s), 2/1/1978)
- ML20005B643 - "Procedure for Handling Q-Listed Items." (19 page(s), 4/14/1980)
- ML20005B646 - "Procedure for Certification of Inspectors of Handling Equipment & Rigging." (13 page(s), 8/26/1980)
- ML20005B648 - "Procedure for Handling of Q-Listed Items." (18 page(s), 10/10/1980)
- ML20005B649 - "General Requirements for Training & Testing of Maint Div Personnel." (9 page(s), 7/3/1980)
- ML20263C269 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Drywell Head Load Path).Sheet 6. (1 page(s), 10/23/1973)
- ML20263C291 - "Equipment Location:Turbine Building Plan At El 165 Ft," as-built.((Reactor) Feed Pump Crane - 20H07 - 30H07 Pump & Turbine Load Path).Sheet 14. (1 page(s), 10/23/1973)
- ML20263C342 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (FP Filter Demin Hoist - 00H55 Filter Load Path). Sheet 33. (1 page(s), 2/6/1977)
- ML20263C325 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (5000 Escapement Door Lift Winch - 00H32 Vertical Load Path).Sheet 27. (1 page(s), 2/6/1973)
- ML20263C362 - "General Arrangement Plan At El 135 Ft," as-built. (Reactor Bldg CRD Jib Crane Load Path).Sheet 41. (1 page(s), 10/23/1975)
- ML20263C356 - "Emergency Cooling Tower Switchgear Area," as-built. (Emergency CT Emergency Cooling Tower Hoist - 00H49 Emerg CT Jib Crane - 00H49).Sheet 38. (1 page(s), 12/15/1975)
- ML20263C353 - "Equipment Location:Reactor and Radwaste Building Plan At El 165 Ft," as-built.(Precoat Material Handling - 20H54 - 30H54 Vertical Load Path).Sheet 37.No revision date. (1 page(s), 6/18/1981)
- ML20263C266 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Slot Plug Load Path).Sheet 5. (1 page(s), 10/23/1973)
- ML20263C300 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Reactor Building Recirc Pump Motor Hoists Load Path).Sheet 18.No revision date. (1 page(s), 6/18/1981)
- ML20263C315 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (CRD Removal Hoist - 20H05 - 30H05 Load Path). Sheet 23. (1 page(s), 2/6/1977)
- ML20263C277 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Separator Load Path).Sheet 9. (1 page(s), 10/23/1973)
- ML20263C288 - "General Arrangement:Plan At El 165 Ft," as-built. (TB Crane - OAH09 - OBH09 - Turbine & Generator Rotor & Parts Load Path Units 2 & 3).Sheet 13. (1 page(s), 10/23/1973)
- ML20263C347 - "CW Pump Structure Plan Elev 112 Ft & 116 Ft," as-built. (CW Pump Structure Trash Handling Equipment Hoist - 20H50 - 30H50 Load Path).Sheet 35. (1 page(s), 6/16/1973)
- ML20263C368 - "CW Screen Structure Weatherproof Building," as-built. (Screen Structure Trash Handling Eqpt Hoist - 2AH45,2BH45, 3AH45 & 3BH45).Sheet 39. (1 page(s), 6/12/1973)
- ML20263C344 - "Plot Plan." (Restricted Areas For 15 Ton Yard Crane 00H56 - Ground Floor).Sheet 34.No revision date. (1 page(s), 6/18/1981)
- ML20263C257 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas For the Movement Of Heavy Loads During Plant Operation.) Sheet 1. (1 page(s), 10/23/1973)
- ML20263C302 - "General Arrangement:Plan At El 116 Ft," as-built. (Condensate Pump Hoist - 20H15 - 30H15 Condensate Pump Aux Hoist - 20H43 - 30H43 Load Path).Sheet 19.No revision date. (1 page(s), 6/18/1981)
- ML20263C334 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Torus Equipment Removal Hoist 00H37 - Load Path).Sheet 30. (1 page(s), 2/6/1973)
- ML20263C320 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Personnel Lock Hoist - 20H22 - 30H22 Personnel Lock Load Path).Sheet 25. (1 page(s), 2/6/1977)
- ML20263C374 - "Equipment Location:Reactor Building Plan At El 195 Ft," as-built.(Reactor Bldg - El 195 Ft CRD Maintenance Bridge Crane Load Path).Sheet 44. (1 page(s), 10/23/1973)
- ML20263C337 - "Off-Gas Filter Building Plans,Elevation,Details," as-built. (Off Gas Filter Trolley - 00H53 Load Path).Sheet 31. (1 page(s), 6/16/1972)
- ML20263C260 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor Shield Plug Load Path).Sheet 3. (1 page(s), 10/23/1973)
- ML20263C317 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Equipment Access Lock Removal Hoist - 20H04 - 30H04 Load Path).Sheet 24. (1 page(s), 2/6/1977)
- ML20263C365 - "General Arrangement Plan At El 195 Ft," as-built. (Reactor Building - El 195 Ft CRD Transport Jib Crane Load Path).Sheet 42. (1 page(s), 10/23/1975)
- ML20263C282 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 Refueling Floor - Fuel Shipping Cask Load Path).Sheet 11. (1 page(s), 10/23/1973)
- ML20263C274 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Dryer Load Path).Sheet 8. (1 page(s), 10/23/1973)
- ML20263C294 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Reactor Building Recir Pump Motor-Gen Hoist 20H06 - 30H06 Load Path).Sheet 16. (1 page(s), 6/18/1981)
- ML20263C328 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (2500 Escapement Door Lift Winch - 0AH33 - 0BH33 Vertical Load Path).Sheet 28. (1 page(s), 2/6/1973)
- ML20263C331 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (RW Building Demin Hoist - 00H35 Load Path). Sheet 29. (1 page(s), 2/6/1973)
- ML20263C310 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (Reactor Building CRD Removal Platform Winch - Hoist (Wall Mounted) 20H20,30H20).Sheet 21.No revision date. (1 page(s), 6/18/1981)
- ML20263C254 - "Equipment Location:Reactor and Radwaste Building," as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas For The Movement of Heavy Loads During Refueling.)Sheet 2. (1 page(s), 10/23/1973)
- ML20263C263 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane - 20H01 - 30H01 (Stm Dryer-Sep) Pool Plug - Load Path).Sheet 4. (1 page(s), 10/23/1973)
- ML20263C271 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane - 20H01 - 30H01 Refueling Floor - RPV Head Load Path).Sheet 7. (1 page(s), 10/23/1973)
- ML20263C297 - "CW Pump Structure Plan Elev 112 Ft & 116 Ft," as-built. (Pump Structure Crane-00H16 - Load Path Pump Base - Pump Bldg Floor - El 112 Ft Pull Up Hatch & Load Path - Pump Bldg Roof - El 130 Ft 6 Inches Ground Floor - El 116 Ft).Sheet 17 (1 page(s), 6/18/1981)
- ML20263C350 - "Stack Requirements," as-built.(Off Gas Stack Hoist Jib Crane - 00H46 Load Path).Sheet 36. (1 page(s), 11/22/1975)
- ML20263C340 - "Equipment Location:Recombiner Building Plans and Section," as-built.(Recombiner Building Hoist - 00H42 Load Path). Sheet 32. (1 page(s), 10/29/1975)
- ML20263C313 - "Equipment Location:Reactor and Radwaste Building Plan At El 135 Ft." (CRD Transfer Cart Removal Winch - 00H34 CRD Transfer Cart Path).Sheet 22.No revision date. (1 page(s), 6/18/1981)
- ML20263C285 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 & 30H01 Refueling Floor - New Fuel Load Path).Sheet 12. (1 page(s), 10/23/1973)
- ML20263C359 - "General Arrangement Plan At El 165 Ft," as-built. (Radwaste Bldg Equipment Hoist Load Path).Sheet 40. (1 page(s), 10/23/1975)
- ML20263C322 - "Equipment Location:Turbine Building Plan At El 135 Ft," as-built.(Condensate Demin Hoist - 20H25 - 30H25 Condensate Demin Aux Hoist - 20H47 - 30H47 Load Path).Sheet 26. (1 page(s), 1/23/1973)
- ML20263C371 - "General Arrangement Plan At El 195 Ft," as-built. (Reactor Building - El 195 Ft CRD Storage Jib Crane Load Path).Sheet 43. (1 page(s), 10/23/1973)
- ML20263C279 - "Equipment Location:Reactor and Radwaste Building Plan At El 234 Ft," as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Fuel Load Path).Sheet 10. (1 page(s), 10/23/1973)
- ML20263C305 - "Shop & Warehouse 5 Ton Crane Runway," as-built.(Machine Shop Crane - 00H12 Load Path).Sheet 20. (1 page(s), 12/15/1975)