Home > NRC Library > ADAMS Public Documents
Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report
Accession Number: ML19360A097
Date Released: Wednesday, January 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19360A087 - Salem Generating Station, Units 1 & 2, Submittal of Revision 31 to Updated Final Safety Analysis Report and Technical Specification Bases Changes & Quality Assurance Topical Report, NO-AA-10, Rev. 88. (128 page(s), 12/5/2019)
- ML19360A083 - Salem Generating Station, Units 1 & 2, Hope Creek Generating Station, Quality Assurance Topical Report, NO-AA-10, Revision 88. (4 page(s), 12/5/2019)
- ML20042D666 - Salem and Hope Creek Generating Stations Quality Assurance Topical Report NO-AA-10, Rev. 88 (138 page(s), 6/28/2019)
- ML19360A088 - Salem Generating Station, Unit 1, Technical Specification Bases. (113 page(s), 12/5/2019)
- ML19360A090 - Salem Generating Station, Unit 2, Technical Specification Bases. (112 page(s), 12/5/2019)
- ML19360A105 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 1, Master Table of Contents. (75 page(s), 12/5/2019)
- ML19360A111 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (246 page(s), 12/5/2019)
- ML19360A114 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems. (579 page(s), 12/5/2019)
- ML19360A117 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (380 page(s), 12/5/2019)
- ML19360A116 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System And Connected Systems. (332 page(s), 12/5/2019)
- ML19360A113 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (304 page(s), 12/5/2019)
- ML19360A100 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (367 page(s), 12/5/2019)
- ML19360A102 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems. (73 page(s), 12/5/2019)
- ML19360A101 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (379 page(s), 12/5/2019)
- ML19360A103 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (117 page(s), 12/5/2019)
- ML19360A108 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (158 page(s), 12/5/2019)
- ML19360A104 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (35 page(s), 12/5/2019)
- ML19360A107 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation. (29 page(s), 12/5/2019)
- ML19360A112 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation. (62 page(s), 12/5/2019)
- ML19360A110 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis. (751 page(s), 12/5/2019)
- ML19360A106 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Chapters 16, 17 and Appendix A. (117 page(s), 12/5/2019)
- ML19360A109 - Salem Generating Station, Units 1 & 2, Revision 31 to Updated Final Safety Analysis Report, Appendix B. (93 page(s), 12/5/2019)