Home > NRC Library > ADAMS Public Documents
Forwards details of stress analysis for underground piping, per NRC request.Seven oversize drawings encl.Aperture cards in PDR.
Accession Number: ML19352A006
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19352A005 - Forwards details of stress analysis for underground piping, per NRC request.Seven oversize drawings encl.Aperture cards in PDR. (73 page(s), 2/17/1981)
- ML20260K699 - Marked-up "Safety-Related Yard Piping From Tanks 1T 60,1T 71 & 1T 72 to Auxiliary Building." Sheet 1. (1 page(s), 1/11/1979)
- ML20260K702 - Marked-up "Safety-Related Yard Piping From Tanks 2T 60,2T 71 & 2T 72 to Auxiliary Building." Sheet 2. (1 page(s), 7/27/1979)
- ML20260K711 - Marked-up "Yard Piping Plan Area B." (1 page(s), 7/27/1979)
- ML20260K714 - Marked-up "Yard Piping Plan Area C." (1 page(s), 11/21/1979)
- ML20260K719 - Marked-up "Yard Piping Plan Area D." (1 page(s), 8/13/1980)
- ML20260K721 - Marked-up "Yard Piping Plan Area E." (1 page(s), 1/5/1981)
- ML20260K724 - Marked-up "Diesel Gen Fuel Supply And Return Lines in Yard, From Storage Tanks to South Bldg Wall." (1 page(s), 3/2/1979)