Home > NRC Library > ADAMS Public Documents
Columbia, 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report
Accession Number: ML19343C030
Date Released: Thursday, September 22, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19343B974 - Columbia Generating Station, Submittal of 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report (11 page(s), 12/5/2019)
- ML19343C031 - Columbia, Rev. 111 to Licensee Controlled Specifications Manual - Part 1 of 2. (440 page(s), 12/5/2019)
- ML19343C035 - Columbia, Rev. 111 to Licensee Controlled Specifications Manual - Part 2 of 2. (648 page(s), 12/5/2019)
- ML19343C037 - Columbia, OQAPD-01, Rev. 55, "Operational Quality Assurance Program Description." (54 page(s), 9/16/2019)
- ML19343C060 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (52 page(s), 12/5/2019)
- ML19343C065 - Columbia, Amendment 65 to Final Safety Analysis Report, General Table of Contents and List of Effective Pages. (605 page(s), 12/5/2019)
- ML19343C087 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment, and Systems (1218 page(s), 12/5/2019)
- ML19343C115 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 4, Reactor (640 page(s), 12/5/2019)
- ML19343C178 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems (416 page(s), 12/5/2019)
- ML19343C182 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 8, Electric Power (180 page(s), 12/5/2019)
- ML19343C247 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems (367 page(s), 12/5/2019)
- ML19343C251 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System and Chapter 11, Radioactive Waste Management. (269 page(s), 12/5/2019)
- ML19343C253 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 12, Radiation Protection (118 page(s), 12/5/2019)
- ML19343C280 - Columbia, Amendment 65 to Final Safety Analysis Report, Chapter 13, Conduct of Operations, Chapter 14, Initial Test Program and Chapter 15, Accident Analyses, Chapter 16, Chapter 17 and Appendices A to J. (1170 page(s), 12/5/2019)