Home > NRC Library > ADAMS Public Documents
Forwards applicant direct testimony in environ phase of proceeding scheduled to begin 810112.Testimony addresses issues re cooling lake,energy alternatives,transmission lines,alternative sites & barge slips.
Accession Number: ML19343B832
Date Released: Monday, December 23, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19343B831 - Forwards applicant direct testimony in environ phase of proceeding scheduled to begin 810112.Testimony addresses issues re cooling lake,energy alternatives,transmission lines,alternative sites & barge slips. (5 page(s), 12/18/1980)
- ML19343B833 - Testimony on behalf of util re TX PIRG Contentions 2 & 4 & McCorkle Contention 2 concerning cooling lake recreational benefits & dam extension. (34 page(s), 12/18/1980)
- ML19343B834 - Testimony on behalf of util re TX PIRG Contention 2,Griffith Contention 4 & McCorkle Contention 2 concerning cooling lake recreational benefits.Resume & calculations of total chlorine residuals encl. (88 page(s), 12/18/1980)
- ML19343B836 - Testimony on behalf of util re energy alternatives.Info re planned generation additions,sys capability,load purchase power & reserve for 1977-1990 encl. (20 page(s), 12/18/1980)
- ML19343B837 - Testimony on behalf of util re energy alternatives.Tables of actual & projected sales & peak loads for 1979,1990 & 2000 encl. (27 page(s), 12/18/1980)
- ML19343B838 - Testimony on behalf of util re energy alternatives.Charts re levelized electricity cost from facility & coal alternatives encl. (56 page(s), 12/18/1980)
- ML19343B839 - Testimony on behalf of util re TX PIRG Contention 5 concerning solid waste combustion. (13 page(s), 12/18/1980)
- ML19343B840 - Testimony on behalf of util re TX PIRG addl Contention 12 concerning interconnection/purchase of power.Natl Electric Reliability Council annual rept encl. (92 page(s), 12/18/1980)
- ML19343B841 - Testimony on behalf of util re Rentfro/Marrack contention concerning health effects of high voltage transmission lines. (39 page(s), 12/18/1980)
- ML19343B842 - Testimony on behalf of util re Marrack Contention 2(c) re transmission lines & waterfowl. (28 page(s), 12/18/1980)
- ML19343B843 - Testimony on behalf of util re TX PIRG addl Contention 1 re barge slip.Dames & Moore rept "Environ Assessment & Responses to NRC Questions:Transportation of Reactor Pressure Vessel," encl. (87 page(s), 12/18/1980)
- ML19343B844 - Testimony on behalf of util re TX PIRG Contention 1 re South Texas Project 3 versus Allens Creek site.Listing of cost savings encl. (22 page(s), 12/18/1980)
- ML19343B845 - Testimony on behalf of util re Hinderstein Contention 5 concerning coastal sites. (26 page(s), 12/18/1980)
- ML19343B846 - Testimony on behalf of util re Hinderstein Contention 5 concerning coastal sites. (10 page(s), 12/18/1980)
- ML19343B847 - Testimony on behalf of util re TX PIRG Contention 1 concerning South Texas Project 3 versus Allens Creek 1. Analysis of prime farmland soils encl. (20 page(s), 12/18/1980)
- ML19343B848 - Testimony on behalf of util re Bishop Contention 1 concerning population projections. (51 page(s), 12/18/1980)
- ML19343B849 - Testimony on behalf of util re Hinderstein Contention 5 concerning coastal site.TERA Corp "Coastal Site Comparison Rept," encl. (200 page(s), 12/18/1980)