Home > NRC Library > ADAMS Public Documents
Watts Bar Nuclear Plant, Units 1 & 2, Submittal of Amendment 2 to Updated Final Safety Analysis Report - Redacted
Accession Number: ML19337B410
Date Released: Monday, December 9, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19336A065 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions - Redacted (943 page(s), 3/18/2019)
- ML19336A066 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Redacted (488 page(s), 3/18/2019)
- ML19336A067 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features - Redacted (1158 page(s), 3/18/2019)
- ML19336A068 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted (251 page(s), 3/18/2019)
- ML19176A147 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Table of Contents (15 page(s), 3/18/2019)
- ML19176A137 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (4 page(s), 3/18/2019)
- ML19176A136 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (3 page(s), 3/18/2019)
- ML19176A135 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (520 page(s), 3/18/2019)
- ML19176A134 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (337 page(s), 3/18/2019)
- ML19176A133 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (21 page(s), 3/18/2019)
- ML19176A132 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection - Redacted (116 page(s), 3/18/2019)
- ML19176A131 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (150 page(s), 3/18/2019)
- ML19176A130 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems (232 page(s), 3/18/2019)
- ML19176A145 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System - Redacted (845 page(s), 3/18/2019)
- ML19176A142 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (292 page(s), 3/18/2019)
- ML19176A139 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System (308 page(s), 3/18/2019)
- ML19176A138 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor (290 page(s), 3/18/2019)
- ML19176A160 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9 to 3.12 - Redacted (201 page(s), 3/18/2019)
- ML19176A159 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category 1 Structures - Redacted (441 page(s), 3/18/2019)
- ML19176A153 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - Redacted (264 page(s), 3/18/2019)
- ML19176A129 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant - Redacted (138 page(s), 3/18/2019)
- ML19176A150 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Main Table of Contents (18 page(s), 3/18/2019)
- ML19176A149 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report, Effective Page Lising (266 page(s), 3/18/2019)
- ML19078A070 - Watts Bar Nuclear Plant, Units 1 & 2, Amendment 2 to Updated Final Safety Analysis Report (4 page(s), 3/18/2019)