NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards justification for full power operation in unrodded mode in Cycle 4 of Unit 1 & proposed Tech Spec 3.5.2 permitting operation in unrodded mode.Requests prompt approval.

Accession Number: ML19312B776

Date Released: Friday, November 22, 2019

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer