Home > NRC Library > ADAMS Public Documents
Perry Nuclear Power Plant, Submittal of Revision 21 to Updated Final Safety Analysis Report.
Accession Number: ML19298C581
Date Released: Monday, February 10, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19298C673 - Perry Nuclear Power Plant, Submittal of Revision 21 to Updated Final Safety Analysis Report. (8 page(s), 10/18/2019)
- ML19298C592 - Perry Nuclear Power Station Revision 21to Updated Final Safety Analysis Report, List of Effective Pages. (65 page(s), 10/18/2019)
- ML19298C593 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 0, Master Table of Contents. (27 page(s), 10/18/2019)
- ML19298C594 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (483 page(s), 10/18/2019)
- ML19298C595 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.0 to 2.4.(Redacted) (399 page(s), 10/18/2019)
- ML19298C598 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.5 to 2E. (1384 page(s), 10/18/2019)
- ML19298C599 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and System. (1246 page(s), 10/18/2019)
- ML19298C600 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (140 page(s), 10/18/2019)
- ML19298C601 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant Systems and Connected Systems. (242 page(s), 10/18/2019)
- ML19298C602 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (492 page(s), 10/18/2019)
- ML19298C605 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems. (352 page(s), 10/18/2019)
- ML19298C607 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power. (188 page(s), 10/18/2019)
- ML19298C610 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (1112 page(s), 10/18/2019)
- ML19298C613 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (94 page(s), 10/18/2019)
- ML19298C615 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (238 page(s), 10/18/2019)
- ML19298C618 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection.(Redacted) (241 page(s), 10/18/2019)
- ML19298C620 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (75 page(s), 10/18/2019)
- ML19298C621 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (337 page(s), 10/18/2019)
- ML19298C622 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis. (753 page(s), 10/18/2019)
- ML19298C624 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (2 page(s), 10/18/2019)
- ML19298C626 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (3 page(s), 10/18/2019)
- ML19298C627 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figure List For All Chapters, Rev. 20. (64 page(s), 10/18/2019)
- ML19298C628 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 01. (Redacted) (26 page(s), 10/18/2019)
- ML19298C629 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 02 (2.1-1 to 2.5-46). (184 page(s), 10/18/2019)
- ML19298C632 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 02 (2.5-47 to 2.5-49). (26 page(s), 10/18/2019)
- ML19298C635 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 02 (2.5-50 to 2.5-215). (232 page(s), 10/18/2019)
- ML19298C638 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Sections 02D-1 to 02D-2. (25 page(s), 10/18/2019)
- ML19298C641 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Sections 02D-3 to 02E-1. (66 page(s), 10/18/2019)
- ML19298C642 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 03. (Redacted) (365 page(s), 10/18/2019)
- ML19298C643 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 04. (19 page(s), 10/18/2019)
- ML19298C645 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 05. (61 page(s), 10/18/2019)
- ML19298C648 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 06. (153 page(s), 10/18/2019)
- ML19298C651 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 07. (86 page(s), 10/18/2019)
- ML19298C653 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 08. (Redacted) (22 page(s), 10/18/2019)
- ML19298C655 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 09 (9.1-1 to 9.4-29). (Redacted) (128 page(s), 10/18/2019)
- ML19298C656 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 09 (9.5-1 to 9.5-26). (27 page(s), 10/18/2019)
- ML19298C657 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 09 (9A-1 to 9A-34). (Redacted) (29 page(s), 10/18/2019)
- ML19298C659 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 10. (36 page(s), 10/18/2019)
- ML19298C662 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 11. (28 page(s), 10/18/2019)
- ML19298C665 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 12. (Redacted) (35 page(s), 10/18/2019)
- ML19298C666 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 13. (2 page(s), 10/18/2019)
- ML19298C667 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 14. (5 page(s), 10/18/2019)
- ML19298C668 - Perry Nuclear Power Station Revision 21 to Updated Final Safety Analysis Report, Figures, Section 15. (149 page(s), 10/18/2019)