NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 790313 ltr re shutdown of five nuclear power plants because of seismic concerns.Seismic design was not in accord w/accepted engineering practice.Failed piping could cause LOCA.Plant review is being expedited.

Accession Number: ML19268B858

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer