Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 & 4, Submittal of Revision 8 to Updated Final Safety Analysis Report, Revision 7 to Tier 1, Revision 12 to Technical Requirements Manual and Revision 51 to Technical Specifications (TS) Bases.
Accession Number: ML19171A096
Date Released: Friday, June 28, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19171A093 - Vogtle Electric Generating Plant, Units 3 & 4, Submittal of Revision 8 to Updated Final Safety Analysis Report, Revision 7 to Tier 1, Revision 12 to Technical Requirements Manual and Revision 51 to Technical Specifications (TS) Bases (24 page(s), 6/14/2019)
- ML19171A051 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (464 page(s), 3/21/2019)
- ML19171A052 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (445 page(s), 3/21/2019)
- ML19171A053 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2.4A - Observation Well Installation and Development Report (230 page(s), 3/21/2019)
- ML19171A054 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2.4B - Groundwater Model Development & Analysis (141 page(s), 3/21/2019)
- ML19171A055 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.5, Geology, Seismology, and Geotechnical Engineering (474 page(s), 3/21/2019)
- ML19171A056 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2.5A - Geotechnical Investigation and Laboratory Testing Data Report - ESP (97 page(s), 3/21/2019)
- ML19171A057 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (356 page(s), 3/21/2019)
- ML19171A058 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.8, Design of Category I Structures (196 page(s), 3/21/2019)
- ML19171A059 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.9, Mechanical Systems and Components (394 page(s), 3/21/2019)
- ML19171A060 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Appendix 3G, Nuclear Island Seismic Analyses (110 page(s), 3/21/2019)
- ML19171A061 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Appendix 3H, Auxiliary and Shield Building Critical Sections (137 page(s), 3/21/2019)
- ML19171A063 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor (196 page(s), 3/21/2019)
- ML19171A064 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (200 page(s), 3/21/2019)
- ML19171A065 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (285 page(s), 3/21/2019)
- ML19171A066 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (304 page(s), 3/21/2019)
- ML19171A067 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (93 page(s), 3/21/2019)
- ML19171A068 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (592 page(s), 3/21/2019)
- ML19171A069 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (139 page(s), 3/21/2019)
- ML19171A070 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (182 page(s), 3/21/2019)
- ML19171A071 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (200 page(s), 3/21/2019)
- ML19171A072 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation (92 page(s), 3/21/2019)
- ML19171A073 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (189 page(s), 3/21/2019)
- ML19171A074 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (689 page(s), 3/21/2019)
- ML19171A075 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (8 page(s), 3/21/2019)
- ML19171A076 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (36 page(s), 3/21/2019)
- ML19171A077 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (89 page(s), 3/21/2019)
- ML19171A078 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 8 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment (413 page(s), 3/21/2019)
- ML19171A045 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 7 to Tier 1. (567 page(s), 3/21/2019)
- ML19171A043 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 12 to Technical Requirements Manual (59 page(s), 3/21/2019)
- ML19171A050 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 51 to Technical Specifications (TS) Bases (667 page(s), 3/21/2019)
- ML19171A094 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - AP1000RCP-06-009-NP, "Structural Analysis Summary for the AP1000 Reactor Coolant Pump High Inertia Flywheel," Revision 3 (Public Version) (29 page(s), 3/21/2019)
- ML19171A095 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - WCAP-15927-NP, "Design Process for AP1000 Common Q Safety Systems," Revision 7 (Public Version) (34 page(s), 3/21/2019)