Home > NRC Library > ADAMS Public Documents
H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report.
Accession Number: ML19155A082
Date Released: Monday, June 1, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19148A615 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report (226 page(s), 5/28/2019)
- ML19155A085 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, List of Effective Pages, Table of Contents (55 page(s), 5/28/2019)
- ML19155A086 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (72 page(s), 5/28/2019)
- ML19155A087 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (235 page(s), 5/28/2019)
- ML19155A088 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (407 page(s), 5/28/2019)
- ML19155A089 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor (88 page(s), 5/28/2019)
- ML19155A090 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (102 page(s), 5/28/2019)
- ML19155A091 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (363 page(s), 5/28/2019)
- ML19155A092 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (160 page(s), 5/28/2019)
- ML19155A093 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (53 page(s), 5/28/2019)
- ML19155A094 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (195 page(s), 5/28/2019)
- ML19155A095 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (70 page(s), 5/28/2019)
- ML19155A096 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (71 page(s), 5/28/2019)
- ML19155A097 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (52 page(s), 5/28/2019)
- ML19155A098 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (26 page(s), 5/28/2019)
- ML19155A099 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (74 page(s), 5/28/2019)
- ML19155A100 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (360 page(s), 5/28/2019)
- ML19155A101 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (4 page(s), 5/28/2019)
- ML19155A102 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (47 page(s), 5/28/2019)
- ML19155A103 - H.B. Robinson Steam Electric Plant, Unit 2, Revision 28 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities (29 page(s), 5/28/2019)