Home > NRC Library > ADAMS Public Documents
Transmittal Of Revision 25 Of The DAEC Updated Final Safety Analysis Report And The Current DAEC Technical Specifications Bases.
Accession Number: ML19100A055
Date Released: Friday, September 13, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19100A042 - Transmittal Of Revision 25 Of The DAEC Updated Final Safety Analysis Report And The Current DAEC Technical Specifications Bases. (5 page(s), 3/21/2019)
- ML19100A043 - Duane Arnold Energy Center Revised Technical Requirements Manual. (165 page(s), 3/21/2019)
- ML19100A010 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Table of Contents. (81 page(s), 3/21/2019)
- ML19100A011 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of Plant. (246 page(s), 3/21/2019)
- ML19100A012 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 2.0, Site Characteristics. (315 page(s), 3/21/2019)
- ML19100A013 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems. (651 page(s), 3/21/2019)
- ML19100A014 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 4.0, Reactor. (70 page(s), 3/21/2019)
- ML19100A015 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected Systems. (276 page(s), 3/21/2019)
- ML19100A016 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features. (315 page(s), 3/21/2019)
- ML19100A017 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls. (363 page(s), 3/21/2019)
- ML19100A018 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 8.0, Electric Power. (40 page(s), 3/21/2019)
- ML19100A019 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 9.0, Auxiliary Systems. (294 page(s), 3/21/2019)
- ML19100A020 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion. (45 page(s), 3/21/2019)
- ML19100A021 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (204 page(s), 3/21/2019)
- ML19100A022 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (54 page(s), 3/21/2019)
- ML19100A023 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (48 page(s), 3/21/2019)
- ML19100A024 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (93 page(s), 3/21/2019)
- ML19100A025 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (407 page(s), 3/21/2019)
- ML19100A026 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (1 page(s), 3/21/2019)
- ML19100A027 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (103 page(s), 3/21/2019)
- ML19100A028 - Duane Arnold Energy Center Rev. 25 to Updated Final Safety Analysis Report, Chapter 18, License Renewal. (55 page(s), 3/21/2019)