Home > NRC Library > ADAMS Public Documents
Submittal of Turkey Point, Units 3 & 4 Subsequent License Renewal Application: NUREG/CR-6909 Revision 1 Methodology Update SLRA Revisions.
Accession Number: ML18330A060
Date Released: Thursday, May 16, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18330A029 - Turkey Point, Units 3 & 4, Submittal of Subsequent License Renewal Application re Methodology Update SLRA Revisions. (39 page(s), 11/19/2018)
- ML18330A030 - Document No. 32-9280707-001: Turkey Point 3 & 4 CRDM Nozzle to Adapter Weld Connection EAF Evaluation. (13 page(s), 10/5/2018)
- ML18330A031 - Document No. 32-9280708-001: Turkey Point 3 & 4 Replacement RVCH CRDM Nozzle EAF Analysis. (31 page(s), 10/5/2018)
- ML18330A032 - Document No. 32-92800709-001: TP CRDM Latch Housing Environmentally Assisted Fatigue. (25 page(s), 10/4/2018)
- ML18330A033 - Document No. 32-9280710-001: TP Vent Nozzle Environmentally Assisted Fatigue. (30 page(s), 10/4/2018)
- ML18330A034 - Document No. 32-9280711-01: Turkey Point SLR EAF Analysis for Reactor Vessel Flange. (23 page(s), 10/5/2018)
- ML18330A035 - Document No. 1700804.315P - Redacted: Pressurizer Spray Nozzle Fatigue Analysis. (23 page(s), 8/22/2018)
- ML18330A036 - Document No. 1700804.318, Rev. 2, Pressurizer Lower Head Loads, Fatigue and EAF Analysis. (28 page(s), 10/12/2018)
- ML18330A037 - Document No. 1700109.401P - Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal (REDACTED). (61 page(s), 10/26/2018)