Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 and 4 - Issuance of Amendments and Granting of Exemptions RE: Updates to Tier 1 Table 2.5.2-3 (LAR 18-010)
Accession Number: ML18232A526
Date Released: Wednesday, October 3, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18232A527 - Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 18-010 - Updates to Tier 1 Table 2.5.2-3. (6 page(s), 9/25/2018)
- ML18232A528 - Exemption - Vogtle Electric Generating Plant, Unit 3 LAR 18-010. (2 page(s), 9/25/2018)
- ML18232A529 - Exemption - Vogtle Electric Generating Plant, Unit 4 LAR 18-010. (2 page(s), 9/25/2018)
- ML18232A530 - Amendment - Vogtle Electric Generating Plant, Unit 3 LAR 18-010. (2 page(s), 9/25/2018)
- ML18232A531 - Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-010. (3 page(s), 9/25/2018)
- ML18232A532 - Amendment - Vogtle Electric Generating Plant, Unit 4 LAR 18-010. (2 page(s), 9/25/2018)
- ML18232A533 - Attachment - Vogtle Electric Generating Plant, Unit 4 LAR 18-010. (3 page(s), 9/25/2018)
- ML18232A535 - Safety Evaluation - LAR 18-010 for Vogtle 3 and 4. (8 page(s), 9/25/2018)