Home > NRC Library > ADAMS Public Documents
Virgil C. Summer Nuclear Station Unit 1 Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018.
Accession Number: ML18221A142
Date Released: Monday, September 10, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18221A134 - Virgil C. Summer Nuclear Station Unit 1 Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018. (10 page(s), 7/31/2018)
- ML18221A145 - Virgil C. Summer Nuclear Station Unit 1 Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018, Cover Sheet. (1 page(s), 5/31/2018)
- ML18221A147 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (148 page(s), 5/31/2018)
- ML18221A150 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (1025 page(s), 5/31/2018)
- ML18221A151 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.1-26, Land Use Within 10 Miles of the Site, 1966-1968. (1 page(s), 5/31/2018)
- ML18221A152 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.4-6, Site Improvements. (1 page(s), 5/31/2018)
- ML18221A153 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-10, Regional ERTS Photo Linear Map. (1 page(s), 5/31/2018)
- ML18221A154 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map. (1 page(s), 5/31/2018)
- ML18221A155 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-25, Structure Map of Reactor Building and Staging Area Excavations. (1 page(s), 5/31/2018)
- ML18221A156 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation. (1 page(s), 5/31/2018)
- ML18221A157 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map. (1 page(s), 5/31/2018)
- ML18221A158 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A'. (1 page(s), 5/31/2018)
- ML18221A159 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B'. (1 page(s), 5/31/2018)
- ML18221A160 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-79, Cross Section C-C'. (1 page(s), 5/31/2018)
- ML18221A161 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 2E, Log of Boring C-2I. (105 page(s), 5/31/2018)
- ML18221A162 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 2F, Key to Soil Symbols and Terms. (85 page(s), 5/31/2018)
- ML18221A165 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems. (810 page(s), 5/31/2018)
- ML18221A166 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 4.0, Reactor. (283 page(s), 5/31/2018)
- ML18221A167 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System. (303 page(s), 5/31/2018)
- ML18221A168 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features. (542 page(s), 5/31/2018)
- ML18221A169 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls. (288 page(s), 5/31/2018)
- ML18221A171 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 8.0, Electric Power. (251 page(s), 5/31/2018)
- ML18221A172 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 9.0, Auxiliary Systems. (341 page(s), 5/31/2018)
- ML18221A175 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 9.2-2 through 9.2-24. (23 page(s), 5/31/2018)
- ML18221A178 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 9.4-1 through 9.4-36. (44 page(s), 5/31/2018)
- ML18221A180 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion System.. (141 page(s), 5/31/2018)
- ML18221A181 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste Management. (181 page(s), 5/31/2018)
- ML18221A182 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 12.0, Radiation Protection. (163 page(s), 5/31/2018)
- ML18221A206 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 12.1-8. (1 page(s), 5/31/2018)
- ML18221A210 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (69 page(s), 5/31/2018)
- ML18221A211 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation. (155 page(s), 5/31/2018)
- ML18221A212 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (442 page(s), 5/31/2018)
- ML18221A213 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (2 page(s), 5/31/2018)
- ML18221A214 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (52 page(s), 5/31/2018)
- ML18221A215 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities. (31 page(s), 5/31/2018)
- ML18221A219 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Approved FSAR Revision Notices. (7 page(s), 5/31/2018)
- ML18253A006 - Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 9, Figures 9.5-1 through 9.5-11 - Redacted. (24 page(s), 5/31/2018)