Home > NRC Library > ADAMS Public Documents
Callaway Plant, Unit 1 - Submittal of Revision OL-23 to Final Safety Analysis Report and Revision 14 to Technical Specification Bases.
Accession Number: ML18207A460
Date Released: Tuesday, February 12, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18170A298 - Callaway Plant, Unit 1 - Submittal of Revision OL-23 to Final Safety Analysis Report and Revision 14 to Technical Specification Bases. (4 page(s), 6/19/2018)
- ML18207A575 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, List of Effective Sections. (5 page(s), 6/19/2018)
- ML18207A576 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, List of Effective Tables. (14 page(s), 6/19/2018)
- ML18207A574 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, List of Effective Figures. (29 page(s), 6/19/2018)
- ML18207A578 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, General Table of Contents. (10 page(s), 6/19/2018)
- ML18207A548 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of the Plant. (149 page(s), 6/19/2018)
- ML18207A550 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 2.0, Site Characteristics. (17 page(s), 6/19/2018)
- ML18207A549 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 2.0, Figures 2.3-1 through 2.5-7. (10 page(s), 6/19/2018)
- ML18207A552 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems. (1087 page(s), 6/19/2018)
- ML18207A551 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 3.0, Figures 3A-1 through 3.8-130. (403 page(s), 6/19/2018)
- ML18207A557 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 4.0, Reactor. (183 page(s), 6/19/2018)
- ML18207A555 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 4.0, Figures 4.2-1 through 4.4-21. (106 page(s), 6/19/2018)
- ML18207A559 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected Systems. (204 page(s), 6/19/2018)
- ML18207A558 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 5.0, Figures 5.1-1 through 5.4-21. (39 page(s), 6/19/2018)
- ML18207A561 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features. (463 page(s), 6/19/2018)
- ML18207A560 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 6.0, Figures 6.3-1 through 6.2.6-1. (225 page(s), 6/19/2018)
- ML18207A563 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls. (357 page(s), 6/19/2018)
- ML18207A562 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 7.0, Figures 7.1-1 through 7.7-16. (57 page(s), 6/19/2018)
- ML18207A566 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 8.0, Electric Power. (146 page(s), 6/19/2018)
- ML18207A565 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 8.0, Figures 8.3-1 through 8.3-7. (10 page(s), 6/19/2018)
- ML18207A568 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (652 page(s), 6/19/2018)
- ML18207A567 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 9, Figures. (185 page(s), 6/19/2018)
- ML18207A571 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (145 page(s), 6/19/2018)
- ML18207A570 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 10, Figures. (65 page(s), 6/19/2018)
- ML18207A573 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (150 page(s), 6/19/2018)
- ML18207A572 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 11, Figures. (26 page(s), 6/19/2018)
- ML18207A581 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 12, Radiation Protection. (119 page(s), 6/19/2018)
- ML18207A580 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 12, Figures. (18 page(s), 6/19/2018)
- ML18207A582 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 13, Conduct of Operations. (2 page(s), 6/19/2018)
- ML18207A583 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 14, Initial Test Program. (4 page(s), 6/19/2018)
- ML18207A586 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 15, Accident Analysis. (381 page(s), 6/19/2018)
- ML18207A584 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 15, Figures. (384 page(s), 6/19/2018)
- ML18207A588 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 16, Technical Requirements. (222 page(s), 6/19/2018)
- ML18207A587 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 16, Figures. (3 page(s), 6/19/2018)
- ML18207A589 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 17, Quality Assurance. (2 page(s), 6/19/2018)
- ML18207A591 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements. (157 page(s), 6/19/2018)
- ML18207A590 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 18, Figures. (15 page(s), 6/19/2018)
- ML18207A592 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement. (83 page(s), 6/19/2018)
- ML18207A594 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Index to NRC Questions and Responses. (167 page(s), 6/19/2018)
- ML18207A593 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, NRC Questions and Responses, Figures. (10 page(s), 6/19/2018)
- ML18207A600 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Change Notice Log. (20 page(s), 6/19/2018)
- ML18207A602 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Operating License Table of Contents. (1 page(s), 6/19/2018)
- ML18207A642 - Callaway Plant, Unit 1, Revision OL-23 to Final Safety Analysis Report, Amendment Index. (60 page(s), 6/19/2018)
- ML18207A664 - Callaway Plant, Unit 1, Revised Operating License, OPL010. (12 page(s), 6/19/2018)
- ML18207A661 - Callaway Plant, Unit 1, Revised Operating License, Environmental Protection Plan (Nonradiological). (9 page(s), 6/19/2018)
- ML18207A643 - Callaway Plant, Unit 1, Operating License, Appendix C, Additional Conditions. (3 page(s), 6/19/2018)
- ML18207A663 - Callaway Plant, Unit 1, Revised Operating License, Nuclear Regulatory Commission Orders, Table Of Contents. (2 page(s), 6/19/2018)
- ML18207A646 - Callaway Plant, Unit 1, Operating License, EA-02-026. (7 page(s), 6/19/2018)
- ML18207A647 - Callaway Plant, Unit 1, Operating License, EA-02-261. (8 page(s), 6/19/2018)
- ML18207A648 - Callaway Plant, Unit 1, Operating License, EA-03-009 Errata. (5 page(s), 6/19/2018)
- ML18207A651 - Callaway Plant, Unit 1, Operating License, EA-03-038. (19 page(s), 6/19/2018)
- ML18207A652 - Callaway Plant, Unit 1, Revised Operating License, EA-03-039. (11 page(s), 6/19/2018)
- ML18207A653 - Callaway Plant, Unit 1, Revised Operating License, EA-03-086. (9 page(s), 6/19/2018)
- ML18207A656 - Callaway Plant, Unit 1, Revised Operating License, EA-05-007. (36 page(s), 6/19/2018)
- ML18207A654 - Callaway Plant, Unit 1, Revised Operating License, EA-05-007 Errata. (105 page(s), 6/19/2018)
- ML18207A657 - Callaway Plant, Unit 1, Revised Operating License, EA-06-037. (17 page(s), 6/19/2018)
- ML18207A658 - Callaway Plant, Unit 1, Revised Operating License, EA-12-049. (37 page(s), 6/19/2018)
- ML18207A659 - Callaway Plant, Unit 1, Revised Operating License, EA-12-051. (40 page(s), 6/19/2018)
- ML18207A660 - Callaway Plant, Unit 1, Revised Operating License, EA-13-237. (23 page(s), 6/19/2018)
- ML18208A157 - Callaway Plant, Unit 1, Revised Site Addendum Item - List of Effective Sections. (3 page(s), 6/19/2018)
- ML18208A158 - Callaway Plant, Unit 1, Revised Site Addendum Item - List of Effective Tables. (5 page(s), 6/19/2018)
- ML18208A156 - Callaway Plant, Unit 1, Revised Site Addendum Item - List of Effective Figures. (9 page(s), 6/19/2018)
- ML18208A159 - Callaway Plant, Unit 1, Revised Site Addendum Item - General Table of Contents. (4 page(s), 6/19/2018)
- ML18208A153 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 1.0, Introduction And General Description Of Plant. (1 page(s), 6/19/2018)
- ML18208A155 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 2.0, Site Characteristics. (860 page(s), 6/19/2018)
- ML18208A154 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 2.0, Figures. (383 page(s), 6/19/2018)
- ML18208A162 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 3.0, Design of Structures, Components, Equipment and Systems. (61 page(s), 6/19/2018)
- ML18208A161 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 3.0, Figures. (51 page(s), 6/19/2018)
- ML18208A163 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 4.0, Reactor. (1 page(s), 6/19/2018)
- ML18208A165 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 8.0, Electric Power. (15 page(s), 6/19/2018)
- ML18208A164 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 8.0, Figures. (14 page(s), 6/19/2018)
- ML18208A167 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 9.0, Auxiliary Systems. (42 page(s), 6/19/2018)
- ML18208A166 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 9.0, Figures. (12 page(s), 6/19/2018)
- ML18208A168 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 10, Steam and Power Conversion System. (6 page(s), 6/19/2018)
- ML18208A169 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 11, Radioactive Waste Management. (26 page(s), 6/19/2018)
- ML18208A171 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 12.0, Radiation Protection. (24 page(s), 6/19/2018)
- ML18208A170 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 12.0, Figure. (1 page(s), 6/19/2018)
- ML18208A173 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 13.0, Conduct of Operations. (65 page(s), 6/19/2018)
- ML18208A172 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 13.0, Figures. (11 page(s), 6/19/2018)
- ML18208A175 - Callaway Plant, Unit 1, Revised Site Addendum Item - Chapter 17.0, Quality Assurance. (2 page(s), 6/19/2018)
- ML18208A176 - Callaway Plant, Unit 1, Revised Site Addendum for Chapter 18.0, Response to NUREG-0737, "Clarification of TMI Action Plan Requirements." (1 page(s), 6/19/2018)
- ML18208A177 - Callaway Plant, Unit 1, Revised Site Addendum Item - NRC_QR. (66 page(s), 6/19/2018)
- ML18208A192 - Callaway Plant, Unit 1, Revised Technical Specification - List of Effective Pages. (6 page(s), 6/19/2018)
- ML18208A193 - Callaway Plant, Unit 1, Revised Technical Specification - Table of Contents. (4 page(s), 6/19/2018)
- ML18208A186 - Callaway Plant, Unit 1, Revised Tech Specification Chapter 1.0, Use and Application. (30 page(s), 6/19/2018)
- ML18208A187 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 2.0, Safety Limits. (2 page(s), 6/19/2018)
- ML18208A188 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.0, Limiting Condition for Operation (LCO) and Surveillance Requirement Applicability. (6 page(s), 6/19/2018)
- ML18208A189 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.1, Reactivity Control Systems. (26 page(s), 6/19/2018)
- ML18208A190 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.2, Power Distribution Limits. (14 page(s), 6/19/2018)
- ML18208A191 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.3, Instrumentation. (86 page(s), 6/19/2018)
- ML18208A196 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.4, Reactor Coolant System. (50 page(s), 6/19/2018)
- ML18208A197 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.5, Emergency Core Cooling Systems (ECCS). (14 page(s), 6/19/2018)
- ML18208A198 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.6, Containment Systems. (25 page(s), 6/19/2018)
- ML18208A199 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.7, Plant Systems. (52 page(s), 6/19/2018)
- ML18208A200 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.8, Electrical Power Systems. (44 page(s), 6/19/2018)
- ML18208A201 - Callaway Plant, Unit 1, Revised Technical Specification Chapter 3.9, Refueling Operations. (15 page(s), 6/19/2018)
- ML18208A202 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter 4.0, Design Features. (4 page(s), 6/19/2018)
- ML18208A203 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter 5.0, Administrative Controls. (33 page(s), 6/19/2018)
- ML18208A324 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, List of Effective Sections. (2 page(s), 6/19/2018)
- ML18208A325 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Table of Contents. (4 page(s), 6/19/2018)
- ML18208A309 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 2.0, Safety Limits. (8 page(s), 6/19/2018)
- ML18208A310 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.0, Safety Limits. (17 page(s), 6/19/2018)
- ML18208A313 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.1, Reactivity Control Systems. (60 page(s), 6/19/2018)
- ML18208A315 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.2, Power Distribution Limits. (30 page(s), 6/19/2018)
- ML18208A316 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.3, Instrumentation. (215 page(s), 6/19/2018)
- ML18208A318 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.4, Reactor Coolant System. (113 page(s), 6/19/2018)
- ML18208A319 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.5, Emergency Core Cooling Systems. (40 page(s), 6/19/2018)
- ML18208A320 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.6, Containment Systems. (50 page(s), 6/19/2018)
- ML18208A321 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.7, Plant Systems. (117 page(s), 6/19/2018)
- ML18208A322 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.8, Electrical Power Systems. (97 page(s), 6/19/2018)
- ML18208A323 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases, Chapter B 3.9, Refueling Operations. (38 page(s), 6/19/2018)
- ML18208A297 - Callaway Plant, Unit 1, Revision 14 to Technical Specification Bases Implemented Change Notice Log. (5 page(s), 6/19/2018)