Home > NRC Library > ADAMS Public Documents
Turkey Point Units 3 and 4 - Submittal of Updated Final Safety Analysis Report - Unit 4 Cycle 29 Update and License Renewal 10 CFR 54.37(b) Report.
Accession Number: ML18117A085
Date Released: Thursday, October 11, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18117A086 - Turkey Point Units 3 and 4 - Submittal of Updated Final Safety Analysis Report - Unit 4 Cycle 29 Update and License Renewal 10 CFR 54.37(b) Report. (3 page(s), 4/26/2018)
- ML18117A087 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, List of Effective Pages. (44 page(s), 4/26/2018)
- ML18117A088 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary. (127 page(s), 4/26/2018)
- ML18117A089 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 2, Site and Environment. (165 page(s), 4/26/2018)
- ML18117A091 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 3, Reactor. (198 page(s), 4/26/2018)
- ML18117A092 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System. (156 page(s), 4/26/2018)
- ML18117A093 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 5, Structures. (308 page(s), 4/26/2018)
- ML18117A094 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (197 page(s), 4/26/2018)
- ML18117A096 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control. (291 page(s), 4/26/2018)
- ML18117A097 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 8, Electrical Systems. (122 page(s), 4/26/2018)
- ML18117A098 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems. (381 page(s), 4/26/2018)
- ML18117A099 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (99 page(s), 4/26/2018)
- ML18117A101 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection System. (121 page(s), 4/26/2018)
- ML18117A102 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations. (6 page(s), 4/26/2018)
- ML18117A103 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations. (1 page(s), 4/26/2018)
- ML18117A116 - Redacted Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 14, Safety Analysis. (545 page(s), 4/26/2018)
- ML18117A117 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 14,Safety Analysis,Appendix 14A thru Appendix 14G. (69 page(s), 4/26/2018)
- ML18117A119 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 15, Technical Specifications. (1 page(s), 4/26/2018)
- ML18117A121 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Chapter 16, Aging Management Programs and Time-Limited Aging Analyses Activities. (32 page(s), 4/26/2018)
- ML18117A122 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Appendix A, A Functional Evaluation of the Components of the Systems Which Are Shared By The Two Units. (12 page(s), 4/26/2018)
- ML18117A123 - Turkey Point Units 3 and 4, Updated Final Safety Analysis Report, Appendix B, Questions and Responses Related to Initial NRC Review of Operating License Application. (13 page(s), 4/26/2018)