Home > NRC Library > ADAMS Public Documents
Suppls 830301 & 03 ltrs re corrective action program concerning 830222 & 25 reactor trip breaker failures.Program precludes recurrence of events.Justification for safe return to svc provided.
Accession Number: ML18087A720
Date Released: Thursday, November 29, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18087A719 - Suppls 830301 & 03 ltrs re corrective action program concerning 830222 & 25 reactor trip breaker failures.Program precludes recurrence of events.Justification for safe return to svc provided. (2 page(s), 3/14/1983)
- ML18087A722 - "ATWS Training Program." (85 page(s), 3/8/1983)
- ML18087A745 - Rev 1 to "Post-Reactor Trip/Safety Injection Review & Startup Approval Requirements." (17 page(s), 3/13/1983)
- ML18087A747 - "Use of Master Equipment List." (8 page(s), 3/11/1983)
- ML18087A733 - Rev 1 to "Solid State Protection Sys Reactor Trip Breaker & Permissive P-4 Permissive Test,Train A." (12 page(s), 12/1/1982)
- ML18087A742 - Rev 1 to "Cold Shutdown to Hot Standby." (40 page(s), 3/7/1983)
- ML18087A727 - "Post-Reactor Trip/Safety Injection Review." (26 page(s), 3/14/1983)
- ML18087A728 - "Reactor Trip & Bypass ACB Semiannual Insp & Testing." (36 page(s), 3/9/1983)
- ML18087A732 - Safety-related, "Solid State Protection Sys Train B,Reactor Trip Breaker UV Coil Functional Test." (8 page(s), 3/14/1983)
- ML18087A738 - Safety-related, "Response Time Test of Solid State Protection Sys Logic-Reactor,Train B." (32 page(s), 11/24/1982)
- ML18087A750 - Rev 10 to "Review of Procurement Documents." (6 page(s), 5/13/1982)
- ML18087A746 - Rev 1 to "Removal & Return of Safety-Related Equipment to Operable Status." (10 page(s), 3/13/1983)
- ML18087A726 - Rev 2 to "Use of Operations Dept Procedures." (15 page(s), 6/2/1982)
- ML18087A723 - Rev 9 to "Reactor Trip." (30 page(s), 3/10/1983)
- ML18087A737 - Safety-related, "Response Time test of Solid State Protection Sys Logic-Reactor Trip,Train A." (31 page(s), 11/24/1982)
- ML18087A748 - Rev 4 to "Insp Order Program." (12 page(s), 2/5/1982)
- ML18087A749 - Rev 8 to "Control of Station Maint." (44 page(s), 3/10/1983)
- ML18087A735 - Rev 1 to safety-related, "Solid State Protection Sys Functional Test Train A." (32 page(s), 3/12/1983)
- ML18087A753 - "QA Training Program." (24 page(s), 3/14/1983)
- ML18087A734 - Rev 1 to "Solid State Protection Sys Reactor Trip Breaker & Permissive P-4 Permissive Test,Train B." (12 page(s), 12/1/1982)
- ML18087A741 - Rev 11 to "Recovery From Safety Injection." (39 page(s), 3/13/1983)
- ML18087A743 - Rev 1 to "Hot Standby to Min Load." (30 page(s), 3/8/1983)
- ML18087A752 - "QA Nuclear Operation Policy." (2 page(s), 3/11/1983)
- ML18087A740 - Rev 5 to "Safety Injection Initiation." (15 page(s), 3/13/1983)
- ML18087A721 - "Corrective Action Program re Reactor Trip Breaker Failures on 830222 & 25." (62 page(s), 3/14/1983)
- ML18087A724 - "ATWT." (13 page(s), 3/8/1983)
- ML18087A739 - Rev 2 to safety-related, "General Procedure for Trouble Shooting,Rework & Repair of Installed Plant Equipment." (10 page(s), 3/10/1983)
- ML18087A736 - Rev 1 to "Solid State Protection Sys Function Test-Train B." (52 page(s), 8/2/1982)
- ML18087A729 - Rev 8 to "Electrical Trouble Shooting & Repair." (14 page(s), 3/11/1983)
- ML18087A751 - "Station Work Orders." (2 page(s), 3/10/1983)
- ML18087A730 - Safety-related, "Solid State Protection Sys Train A,Reactor Trip Breaker UV Coil Functional Test." (8 page(s), 3/14/1983)