Home > NRC Library > ADAMS Public Documents
Braidwood and Byron, Units 1 and 2 - Response to Request for Voluntary Response to Petition re High Energy Line Break in Main Stream Isolation Value Room.
Accession Number: ML17255A838
Date Released: Friday, September 15, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17255A824 - Braidwood and Byron, Units 1 and 2 - Response to Request for Voluntary Response to Petition re High Energy Line Break in Main Stream Isolation Value Room. (21 page(s), 9/1/2017)
- ML17255A829 - Byron, Units 1 and 2 - Calculation 3C8-0282-001, Rev 003, "Main Steam Tunnel Pressure Study for Main Steam Line Break," This Record Contains Corrected Scan, Includes all Pages thru B42. (163 page(s), 10/22/1996)
- ML17255A830 - Byron, Units 1 and 2 - Engineering Change EC 366685, Revision 67, "OP Eval. 07-006, Aux Feed Tunnel Covers Installation," Redacted. (11 page(s), 7/1/2009)
- ML17255A835 - Byron, Units 1 and 2 - Full Action Request Report AR 653093, "The AF Tunnel Covers Do Not Meet Expected Safety Factors," Redacted. (40 page(s), 7/24/2007)
- ML17255A836 - Braidwood, Units 1 and 2 - Full Action Request Report AR 654270, "AF Tunnel Cover Bolt Eval. Uses Non-Standard Safety Factor," Redacted. (31 page(s), 7/26/2007)
- ML17255A837 - Byron, Units 1 and 2 - Full Action Request Report AR 789344, "Error in MS Tunnel Pressurization Calculation," Redacted. (10 page(s), 6/12/2008)
- ML17255A839 - Braidwood, Units 1 and 2 - Full Action Request Report AR 789791, "Potential Loss of Margin in MS Tunnel Pressurization Calc.," Redacted. (28 page(s), 6/20/2008)
- ML17255A840 - Byron, Units 1 and 2 - Full Action Request Report AR 792213, " MSLB Calc. Energy Release Error," Redacted. (4 page(s), 6/30/2008)
- ML17255A841 - Braidwood, Units 1 and 2 - Full Action Request Report AR 792215, "MSLB Calc. Energy Release Error," Redacted. (10 page(s), 6/30/2008)
- ML17255A831 - Byron, Units 1 and 2 - Full Action Request Report AR 1284054, "Legacy Issues with Main Steam Tunnel Pressurization Calculation," Redacted. (6 page(s), 10/31/2011)
- ML17255A832 - Byron, Units 1 and 2 - Full Action Request Report AR 1531420, "No Actions Tracking Update to Calculation 3C8-0282-001," Redacted. (5 page(s), 7/1/2013)
- ML17255A833 - Byron, Units 1 and 2 - Full Action Request Report AR 4046781, "Typographical Errors in UFSAR Section C3.6," Redacted. (5 page(s), 10/22/1996)
- ML17255A834 - Braidwood, Units 1 and 2 - Full Action Request Report AR 4046785, "Typographical Errors in UFSAR Section C3.6," Redacted. (5 page(s), 10/22/1996)
- ML17255A878 - Submittal of Calculation Attachment, FIT Document 32-1239267-01, "Byron / Braidwood SLB for Containment," Information Only. (6 page(s), 9/12/1996)
- ML17255A856 - Calculation FIT Document 32-1239267-01, "Byron / Braidwood SLB for Containment," Information Only. Part 1 of 3. (45 page(s), 9/12/1996)
- ML17255A858 - Calculation FIT Document 32-1239267-01, "Byron / Braidwood SLB for Containment," Information Only. Part 2 of 3. (51 page(s), 9/12/1996)
- ML17255A860 - Calculation FIT Document 32-1239267-01, "Byron / Braidwood SLB for Containment," Information Only. Part 3 of 3. (54 page(s), 9/12/1996)
- ML17255A855 - Braidwood and Byron, Units 1 and 2 - Figures 151 - 200, Part 1 of 15. (50 page(s), 9/1/2017)
- ML17255A857 - Braidwood and Byron, Units 1 and 2 - Figures 201 - 250, Part 2 of 15. (51 page(s), 9/1/2017)
- ML17255A859 - Braidwood and Byron, Units 1 and 2 - Figures 251 - 300, Part 3 of 15. (50 page(s), 9/1/2017)
- ML17255A861 - Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 4 of 15. (50 page(s), 9/1/2017)
- ML17255A863 - Braidwood and Byron, Units 1 and 2 - Figures 301 - 350, Part 5 of 15. (50 page(s), 9/1/2017)
- ML17255A864 - Braidwood and Byron, Units 1 and 2 - Figures 401 - 450, Part 6 of 15. (50 page(s), 9/1/2017)
- ML17255A865 - Braidwood and Byron, Units 1 and 2 - Figures 451 - 499, Part 7 of 15. (49 page(s), 9/1/2017)
- ML17255A866 - Braidwood and Byron, Units 1 and 2 - Figures 500 - 549, Part 8 of 15. (50 page(s), 9/1/2017)
- ML17255A867 - Braidwood and Byron, Units 1 and 2 - Figures 550 - 599, Part 9 of 15. (51 page(s), 9/1/2017)
- ML17255A849 - Braidwood and Byron, Units 1 and 2 - Figures 600 - 649, Part 10 of 15. (50 page(s), 9/1/2017)
- ML17255A850 - Braidwood and Byron, Units 1 and 2 - Figures 650 - 699, Part 11 of 15. (50 page(s), 9/1/2017)
- ML17255A851 - Braidwood and Byron, Units 1 and 2 - Figures 700 - 749, Part 12 of 15. (50 page(s), 9/1/2017)
- ML17255A852 - Braidwood and Byron, Units 1 and 2 - Figures 750 - 799, Part 13 of 15. (50 page(s), 9/1/2017)
- ML17255A853 - Braidwood and Byron, Units 1 and 2 - Figures 800 - 849, Part 14 of 15. (50 page(s), 9/1/2017)
- ML17255A854 - Braidwood and Byron, Units 1 and 2 - Figures 850 - 904, Part 15 of 15. (55 page(s), 9/1/2017)