Home > NRC Library > ADAMS Public Documents
Millstone Power Station, Units 1, 2 and 3, Submittal of Updates to the Defueled Safety Analysis Report and Final Safety Analysis Report.
Accession Number: ML17212A038
Date Released: Tuesday, October 23, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17212A039 - Millstone Power Station, Units 1, 2 and 3, Submittal of Updates to the Defueled Safety Analysis Report and Final Safety Analysis Report. (9 page(s), 6/29/2017)
- ML17212A041 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Frontmatter. (78 page(s), 6/29/2017)
- ML17212A042 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 1, Introduction and Summary. (139 page(s), 6/29/2017)
- ML17212A044 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 3, Reactor. (134 page(s), 6/29/2017)
- ML17212A045 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 4, Reactor Coolant System. (196 page(s), 6/29/2017)
- ML17212A047 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 6, Engineered Safety Features Systems. (149 page(s), 6/29/2017)
- ML17212A048 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 7, Instrumentation and Control. (285 page(s), 6/29/2017)
- ML17212A049 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 8, Electrical Systems. (166 page(s), 6/29/2017)
- ML17212A050 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 9, Auxiliary Systems. (410 page(s), 6/29/2017)
- ML17212A051 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 10, Steam and Power Conversion System. (55 page(s), 6/29/2017)
- ML17212A052 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems. (151 page(s), 6/29/2017)
- ML17212A053 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 12, Conduct of Operations. (16 page(s), 6/29/2017)
- ML17212A054 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 13, Initial Tests and Operation. (102 page(s), 6/29/2017)
- ML17212A056 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 14, Safety Analysis. (497 page(s), 6/29/2017)
- ML17212A058 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Chapter 15, License Renewal. (54 page(s), 6/29/2017)
- ML17212A059 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Technical Requirements Manual. (329 page(s), 6/29/2017)
- ML17212A060 - Millstone Power Station Unit 2 Final Safety Analysis Report, Rev. 35, Drawings. (221 page(s), 6/29/2017)
- ML17212A063 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Frontmatter. (138 page(s), 6/29/2017)
- ML17212A064 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 1, Introduction and General Description of Plant. (322 page(s), 6/29/2017)
- ML17212A065 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 2, Site Characteristics. (701 page(s), 6/29/2017)
- ML17212A066 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 2, Table 2.3-1 through Table 2.5.4-24. (562 page(s), 6/29/2017)
- ML17212A067 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 2, Figure 2.1-1 through Figure 2.4-37. (64 page(s), 6/29/2017)
- ML17212A068 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 2, Figures 2.5.1-1 - 2.5.4-9. (32 page(s), 6/29/2017)
- ML17212A069 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 2, Figures 2.5.5-1 - 2.5.4-75. (88 page(s), 6/29/2017)
- ML17212A070 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 3, Design of Structures, Components, Equipment, and Systems. (835 page(s), 6/29/2017)
- ML17212A071 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 3, Figures 3.2-1 - 3.8-84. (225 page(s), 6/29/2017)
- ML17212A072 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 3, Figures 3A.1.2-1 - 3.9N-12. (114 page(s), 6/29/2017)
- ML17212A073 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 4, Reactor. (249 page(s), 6/29/2017)
- ML17212A074 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 5, Reactor Coolant System and Connected Systems. (209 page(s), 6/29/2017)
- ML17212A076 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 6, Engineered Safety Features. (650 page(s), 6/29/2017)
- ML17212A077 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 7, Instruments and Controls. (364 page(s), 6/29/2017)
- ML17212A079 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 9, Auxiliary Systems. (491 page(s), 6/29/2017)
- ML17212A080 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 10, Steam and Power Conversion System. (130 page(s), 6/29/2017)
- ML17212A081 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 11, Radioactive Waste Management. (219 page(s), 6/29/2017)
- ML17212A082 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 12, Radiation Protection. (101 page(s), 6/29/2017)
- ML17212A083 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 13, Conduct of Operations. (21 page(s), 6/29/2017)
- ML17212A084 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 14, Initial Test Program (184 page(s), 6/29/2017)
- ML17212A086 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 16, Technical Specifications. (3 page(s), 6/29/2017)
- ML17212A087 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 17, Quality Assurance. (3 page(s), 6/29/2017)
- ML17212A088 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 18, Human Factors Engineering. (4 page(s), 6/29/2017)
- ML17212A089 - Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 19, License Renewal. (51 page(s), 6/29/2017)
- ML18295A107 - Redacted - Millstone Power Station, Unit 1, Defueled Safety Analysis Report, Revision 14 (213 page(s), 6/29/2017)
- ML18295A123 - Redacted - Millstone Power Station, Unit 2 - Updated Final Safety Analysis Report, Chapter 5, Revision 35. (413 page(s), 6/29/2017)
- ML18295A114 - Redacted - Millstone Power Station, Unit 2, Updated Final Safety Analysis Report, Chapter 2, Revision 35 (83 page(s), 6/29/2017)
- ML18295A125 - Redacted - Millstone Power Station, Unit 3 - Updated Final Safety Analysis Report, Chapter 8, Revision 30. (139 page(s), 6/29/2017)