NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 0 to Test Procedure TP-157-003, "PMR 85-3097 Standby Liquid Control Vessel Injection" & Calculation M-SLC-004.Calculation determines max standby liquid control sys pressure for injection during ATWS event.

Accession Number: ML17146B022

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer