Responds to NRC 981119 RAI re licensee response to GL 96-06, "Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions." Util will provide requested info for remaining penetrations by 990930.
Accession Number: ML17059C505
Date Released: Thursday, June 29, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17059C503 - Responds to NRC 981119 RAI re licensee response to GL 96-06, "Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions." Util will provide requested info for remaining penetrations by 990930. (72 page(s), 1/20/1999)
- ML17059C526 - REACTOR SHUTDOWN COOLING SYSTEM 38 PIPING ISOMETRIC.Sheet 2 of 2. (1 page(s), 7/22/1991)
- ML17059C527 - SAMPLING SYSTEM 110 PIPING ISOMETRIC FOR REACTOR WATER SAMPLE. (1 page(s), 5/14/1992)
- ML17059C528 - PRIMARY CONTAINMENT PIPING PENETRATIONS.Sheet 3. (1 page(s), 1/3/1979)
- ML17059C529 - PRIMARY CONTAINMENT PIPING PENETRATIONS.Sheet 4. (1 page(s), 8/14/1984)
- ML17059C530 - PRIMARY CONTAINMENT PIPING PENETRATIONS.Sheet 2. (1 page(s), 1/9/1979)
- ML17059C532 - PIPING & INSTRUMENTATION DIAGRAM REACTOR BUILDING CLOSED LOOP COOLING WATER. (1 page(s), 5/3/1995)
- ML17059C533 - PIPING & INSTRUMENTATION DIAGRAM REACTOR BUILDING CLOSED LOOP COOLING WATER.Actual drawing number 12177-PID-13D-11. (1 page(s), 2/15/1991)
- ML17059C534 - PIPING & INSTRUMENTATION DIAGRAM REACTOR WATER CLEANUP SYSTEM. (1 page(s), 10/29/1998)
- ML17059C536 - PIPING & INSTRUMENTATION DIAGRAM REACTOR BUILDING EQUIPMENT & FLOOR DRAINS. (1 page(s), 10/27/1998)
- ML17059C539 - PIPING & INSTRUMENTATION DIAGRAM DRYWELL EQUIPMENT DRAINS. (1 page(s), 12/15/1998)