NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 940803 ltr to President Clinton re util 920709 application to recapture period spent constructing plant to allow for 40 yrs of operation as permitted by NRC regulations in 10CFR50.51.

Accession Number: ML16342C704

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer