Home > NRC Library > ADAMS Public Documents
Forwards application for amends to Licenses DPR-80 & DPR-82, changing Tech Spec 5.3.1, "Fuel Assemblies," to increase reload fuel max enrichment to 4.5 weight percent U-235,to meet Cycle 2 requirements.Fee paid.
Accession Number: ML16341D623
Date Released: Tuesday, February 28, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16341D622 - Forwards application for amends to Licenses DPR-80 & DPR-82, changing Tech Spec 5.3.1, "Fuel Assemblies," to increase reload fuel max enrichment to 4.5 weight percent U-235,to meet Cycle 2 requirements.Fee paid. (6 page(s), 2/14/1986)
- ML16341D624 - Application for amends to Licenses DPR-80 & DPR-82,changing Tech Specs to increase reload fuel max enrichment to 4.5 weight percent U-235. (2 page(s), 2/14/1986)
- ML16342B181 - Revised Tech Spec 5.3.1, "Fuel Assemblies," reflecting proposed authorization to increase reload fuel max enrichment to 4.5 weight percent U-235 to meet Cycle 2 requirements. (12 page(s), 2/14/1986)
- ML16341D625 - "Criticality Safety Analysis of New-Fuel Storage Vault in Diablo Canyon Power Plant W/Fuel of 4.5% Enrichment." (28 page(s), 2/14/1986)