Home > NRC Library > ADAMS Public Documents
June 2016 Submittal of the Updated Final Safety Analysis Report, Revision 4; Tier 1, Revision 4; Technical Specification Bases, Revision 4; and Technical Requirements Manual, Revision 1, for V.C. Summer Nuclear Station Units 2 and 3.
Accession Number: ML16193A229
Date Released: Friday, July 15, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16193A227 - June 2016 Submittal of the Updated Final Safety Analysis Report, Revision 4; Tier 1, Revision 4; Technical Specification Bases, Revision 4; and Technical Requirements Manual, Revision 1, for V.C. Summer Nuclear Station Units 2 and 3. (14 page(s), 7/1/2016)
- ML16193A228 - V.C. Summer Nuclear Station, Unit 2, Technical Specifications Bases, Rev. 4. (602 page(s), 7/1/2016)
- ML16193A230 - V.C. Summer Nuclear Station, Unit 3, Technical Specifications Bases, Rev. 4. (603 page(s), 7/1/2016)
- ML16193A231 - V.C. Summer Nuclear Station Unit 2, Technical Requirements Manual, Rev. 1. (54 page(s), 7/1/2016)
- ML16193A232 - V.C. Summer Nuclear Station, Unit 3 - Technical Requirements Manual, Rev. 1. (54 page(s), 7/1/2016)