Home > NRC Library > ADAMS Public Documents
V.C. Summer Nuclear Station, Units 2 and 3, Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 4 and Tier 1, Revision 4.
Accession Number: ML16193A096
Date Released: Wednesday, October 12, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16193A086 - V.C. Summer Nuclear Station, Units 2 and 3, Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 4 and Tier 1, Revision 4 - Public Version. (3 page(s), 7/1/2016)
- ML16193A091 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 1 - Introduction and General Description of the Plant. (417 page(s), 7/1/2016)
- ML16193A092 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2, Table of Contents. (17 page(s), 7/1/2016)
- ML16193A111 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.0 - Site Characteristics. (8 page(s), 7/1/2016)
- ML16193A112 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.1 - Geography and Demography. (29 page(s), 7/1/2016)
- ML16193A113 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.2 - Nearby Industrial, Transportation, and Military Facilities. (35 page(s), 7/1/2016)
- ML16193A114 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.3 - Meteorology. (130 page(s), 7/1/2016)
- ML16193A115 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.4 - Hydrologic Engineering. (162 page(s), 7/1/2016)
- ML16193A116 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.1 - Basic Geologic and Seismic Information. (103 page(s), 7/1/2016)
- ML16193A118 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.2 - Vibratory Ground Motion. (121 page(s), 7/1/2016)
- ML16193A120 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.3 - Surface Faulting Combined License Information. (13 page(s), 7/1/2016)
- ML16193A121 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.4 - Stability and Uniformity of Subsurface Materials and Foundations. (147 page(s), 7/1/2016)
- ML16193A122 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.5 - Combined License Information for Stability of Slopes. (2 page(s), 7/1/2016)
- ML16193A123 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 2 - Section 2.5.6 - Combined License Information for Embankments and Dams. (1 page(s), 7/1/2016)
- ML16193A093 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Table of Contents. (26 page(s), 7/1/2016)
- ML16193A124 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Design of Structures, Components, Equipment and Systems. (29 page(s), 7/1/2016)
- ML16193A125 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.2 - Classification of Structures, Components, and Systems. (84 page(s), 7/1/2016)
- ML16193A126 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.3 - Wind Loadings. (6 page(s), 7/1/2016)
- ML16193A127 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.4 - Water Level (Flood) Design. (25 page(s), 7/1/2016)
- ML16193A128 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.5 - Missile Protection. (15 page(s), 7/1/2016)
- ML16193A129 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.6 - Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (51 page(s), 7/1/2016)
- ML16193A130 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.7 - Seismic Design. (108 page(s), 7/1/2016)
- ML16193A131 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.8 - Design of Category I Structures. (188 page(s), 7/1/2016)
- ML16193A132 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.9 - Mechanical Systems and Components. (158 page(s), 7/1/2016)
- ML16193A133 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.10 - Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 7/1/2016)
- ML16193A134 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Section 3.11 - Environmental Qualification of Mechanical and Electrical Equipment. (58 page(s), 7/1/2016)
- ML16193A135 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3A - HVAC Ducts and Duct Supports. (3 page(s), 7/1/2016)
- ML16193A136 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3B - Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 7/1/2016)
- ML16193A137 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3C - Reactor Coolant Loop Analysis Methods. (4 page(s), 7/1/2016)
- ML16193A138 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3D - Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (107 page(s), 7/1/2016)
- ML16193A139 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3E - High-Energy Piping in the Nuclear Island. (10 page(s), 7/1/2016)
- ML16193A140 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3F - Cable Trays and Cable Tray Supports. (3 page(s), 7/1/2016)
- ML16193A141 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3G - Part 1 - Nuclear Island Seismic Analyses. (39 page(s), 7/1/2016)
- ML16193A142 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3G - Part 2 - Detailed 3D Finite Element Model of Containment Vessel Including Large Penetrations. (36 page(s), 7/1/2016)
- ML16193A143 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3H - Auxiliary and Shield Building Critical Sections. (79 page(s), 7/1/2016)
- ML16193A145 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 3 - Appendix 3I - Evaluation for High Frequency Seismic Input. (72 page(s), 7/1/2016)
- ML16193A094 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 4 - Reactor. (193 page(s), 7/1/2016)
- ML16193A095 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 5 - Reactor Coolant System and Connected Systems. (199 page(s), 7/1/2016)
- ML16193A097 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 6 - Engineered Safety Features. (272 page(s), 7/1/2016)
- ML16193A098 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 7 - Instrumentation and Controls. (188 page(s), 7/1/2016)
- ML16193A099 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 8 - Electric Power. (88 page(s), 7/1/2016)
- ML16193A100 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 9 - Auxiliary Systems. (580 page(s), 7/1/2016)
- ML16193A101 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 10 - Steam and Power Conversion. (135 page(s), 7/1/2016)
- ML16193A102 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 11 - Radioactive Waste Management. (175 page(s), 7/1/2016)
- ML16193A103 - V.C. Summer Nuclear Station, Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 12 - Radiation Protection. (195 page(s), 7/1/2016)
- ML16193A104 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 13 - Conduct of Operation. (83 page(s), 7/1/2016)
- ML16193A105 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 14 - Initial Test Program. (192 page(s), 7/1/2016)
- ML16193A106 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 15 - Accident Analyses. (640 page(s), 7/1/2016)
- ML16193A107 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 16 - Technical Specifications. (8 page(s), 7/1/2016)
- ML16193A108 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 17 - Quality Assurance. (33 page(s), 7/1/2016)
- ML16193A109 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 18 - Human Factors Engineering. (82 page(s), 7/1/2016)
- ML16193A110 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Chapter 19 - Probabilistic Risk Assessment. (384 page(s), 7/1/2016)
- ML16193A090 - V.C. Summer Nuclear Station Units 2 and 3, Rev. 4 to Updated Final Safety Analysis Report (UFSAR), Tier 1. (561 page(s), 7/1/2016)