Home > NRC Library > ADAMS Public Documents
Uranerz Energy Corp. - Transmittal of Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, December 29, 2014 -December 28, 2015.
Accession Number: ML15363A339
Date Released: Thursday, December 31, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15363A290 - Uranerz Energy Corp. - Transmittal of Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, December 29, 2014 -December 28, 2015. (78 page(s), 12/18/2015)
- ML15363A303 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 1, Revision 4, Site Layout. (1 page(s), 11/10/2015)
- ML15363A304 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 2, Revision 4, Surface Disturbance. (1 page(s), 11/11/2015)
- ML15363A305 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 3, Revision 4, Production Area No. 1 & No. 2 Well Locations. (1 page(s), 11/24/2015)
- ML15363A307 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 4, Revision 4, Monitoring Locations. (1 page(s), 11/11/2015)
- ML15363A306 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 5, Revision 4, Hank Unit Monitoring Locations. (1 page(s), 11/10/2015)
- ML15363A310 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 7, Revision 4, Surface Reclamation. (1 page(s), 12/10/2015)
- ML15363A313 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 8, Revision 4, Spill Map. (1 page(s), 11/11/2015)
- ML15363A311 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 9, Revision 4, Production Area No. 1 & No. 2 Delineation Drilling. (1 page(s), 11/11/2015)
- ML15363A312 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 10, Revision 2, Piezometric Maps Production Zone, October 2015, Production Area No. 1. (1 page(s), 12/3/2015)
- ML15363A308 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 11, Revision 2, Piezometric Maps Overlying, October 2015, Production Area No. 1. (1 page(s), 12/3/2015)
- ML15363A338 - Uranerz Energy Corp. - Nichols Ranch ISR Project WDEQ-LQD Permit to Mine No. 778, Annual Report, Figure 12, Revision 2, Piezometric Maps Underlying Zone, October 2015, Production Area No. 1. (1 page(s), 12/3/2015)