PSEG Site Early Site Permit - Final Safety Evaluation Report (FSER)
Accession Number: ML15229A119
Date Released: Tuesday, September 29, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15236A378 - Letter to PSEG - Final Safety Evaluation Report for the PSEG Site Early Site Permit Application. (5 page(s), 9/25/2015)
- ML15236A370 - Letter to PSEG - Draft Final Safety Evaluation Report for the PSEG Site Early Site Permit Application. (5 page(s), 9/17/2015)
- ML14302A447 - PSEG Site ESP Final Safety Evaluation Report - Chapter 1.0, Introduction and General Description. (36 page(s), 9/16/2015)
- ML14300A226 - PSEG Site ESP Final Safety Evaluation Report - Chapter 2.0 Site Characteristics Section 2.1 through Section 2.4. (199 page(s), 9/16/2015)
- ML14300A394 - PSEG Site ESP Final Safety Evaluation Report - Chapter 2.0 Section 2.5 Geology, Seismology, and Geotechnical Engineering. (144 page(s), 9/16/2015)
- ML14300A502 - PSEG Site ESP Final Safety Evaluation Report - Chapter 3.0 Site Safety Assessment. (5 page(s), 9/16/2015)
- ML14300A522 - PSEG Site ESP Final Safety Evaluation Report - Chapter 11.0 Radioactive Waste Management - Radiological Effluent Release Dose Consequences from Normal Operations. (15 page(s), 9/16/2015)
- ML14300A566 - PSEG Site ESP Final Safety Evaluation Report - Chapter 13.0 Conduct of Operations. (93 page(s), 9/16/2015)
- ML14300A613 - PSEG Site ESP Final Safety Evaluation Report - Chapter 15.0 Accident Analysis. (8 page(s), 9/16/2015)
- ML14300A636 - PSEG Site ESP Final Safety Evaluation Report - Chapter 17.0 Quality Assurance Program Description. (13 page(s), 9/16/2015)
- ML15257A470 - PSEG Site ESP Final Safety Evaluation Report - Chapter 20.0 Requirements Resulting From Fukushima Near-Term Task Force Recommendations (5 page(s), 9/16/2015)
- ML15257A474 - PSEG Site ESP Final Safety Evaluation Report - Chapter 21.0 Review By The Advisory Committee on Reactor Safeguards (1 page(s), 9/16/2015)
- ML15257A476 - PSEG Site ESP Final Safety Evaluation Report - Chapter 22.0 Conclusions (1 page(s), 9/16/2015)
- ML14302A108 - PSEG Site ESP Final Safety Evaluation Report - Appendix A Permit Conditions, COL Action Items, Site Characteristics, Bounding Design Parameters, and Inspections, Tests, Analyses, and Acceptance Criteria. (56 page(s), 9/16/2015)
- ML14302A179 - PSEG Site ESP Final Safety Evaluation Report - Appendix B Chronology of an Early Site Permit Application for the PSEG Site. (74 page(s), 9/16/2015)
- ML14302A182 - PSEG Site ESP Final Safety Evaluation Report - Appendix C References. (32 page(s), 9/16/2015)
- ML14302A334 - PSEG Site ESP Final Safety Evaluation Report - Appendix D Principal Contributors. (2 page(s), 9/16/2015)
- ML14302A342 - PSEG Site ESP Final Safety Evaluation Report - Appendix E Report by the Advisory Committee on Reactor Safeguards. (3 page(s), 9/16/2015)