Home > NRC Library > ADAMS Public Documents
South Texas Project Final Safety Evaluation Report.
Accession Number: ML15212A125
Date Released: Tuesday, September 29, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15260A978 - Letter - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application. (6 page(s), 9/24/2015)
- ML15212A933 - Transmittal Letter for Final Safety Evaluation Report for The South Texas Project, Units 3 and 4 Combined License Application. (4 page(s), 9/29/2015)
- ML15268A313 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Table of Contents. (55 page(s), 9/29/2015)
- ML15257A135 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, List of Abbreviations. (18 page(s), 9/29/2015)
- ML15257A134 - Abstract of the Final Safety Evaluation Report. (2 page(s), 9/29/2015)
- ML15044A150 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 2 - Site Characteristics. (94 page(s), 9/29/2015)
- ML15100A067 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 3 - Design of Structures, Components, Equipment, and Systems. (420 page(s), 9/29/2015)
- ML120050531 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 4 - Reactor. (18 page(s), 9/29/2015)
- ML120250243 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 5 - Reactor Coolant System and Connected Systems. (69 page(s), 9/29/2015)
- ML120830102 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 6 - Engineered Safety Features. (76 page(s), 9/29/2015)
- ML15022A483 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 7 - Instrumentation and Controls Systems. (118 page(s), 9/29/2015)
- ML15021A464 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 8 - Electric Power. (107 page(s), 9/29/2015)
- ML15021A327 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 9 - Auxiliary Systems. (168 page(s), 9/29/2015)
- ML120830037 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 10 - Steam And Power Conversion System. (54 page(s), 9/29/2015)
- ML15029A449 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 11 - Radioactive Management. (44 page(s), 9/29/2015)
- ML15141A137 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 12 - Radiation Protection. (65 page(s), 9/29/2015)
- ML15029A348 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 13 - Conduct of Operations. (135 page(s), 9/29/2015)
- ML121110270 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 14 - Verification Programs. (100 page(s), 9/29/2015)
- ML15132A296 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 15 - Transient And Accident Analyses. (33 page(s), 9/29/2015)
- ML15022A571 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 16 - Technical Specifications. (119 page(s), 9/29/2015)
- ML15021A522 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 17 - Quality Assurance. (41 page(s), 9/29/2015)
- ML15132A312 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 18 - Human Factors Engineering. (32 page(s), 9/29/2015)
- ML15132A342 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 19 - Response To Severe Accident Policy Statement. (139 page(s), 9/29/2015)
- ML15014A137 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Chapter 22 - Requirements Resulting From Fukushima Near-Term Task Force Recommendations. (82 page(s), 9/29/2015)
- ML15257A136 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Appendix A - Post Combined License Activities - License Conditions, Inspections, Tests, Analyses, and Acceptance Criteria.... (102 page(s), 9/29/2015)
- ML15217A280 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Appendix B - Chronology Of Combined License Application for STP Units 3 & 4. (1 page(s), 9/29/2015)
- ML15264B127 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Appendix C - Request for Additional Information. (1 page(s), 9/29/2015)
- ML15257A133 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Appendix D - References. (1 page(s), 9/29/2015)
- ML15244B134 - Final Safety Evaluation Report For the South Texas Project Units 3 and 4 Combined License Application, Appendix E - Principal Contributors. (1 page(s), 9/29/2015)
- ML15039A006 - Report on the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 (13 page(s), 2/19/2015)