Home > NRC Library > ADAMS Public Documents
Beaver Valley, Unit 2, Submittal of the Updated Final Safety Analysis Report, Revision 21.
Accession Number: ML14339A419
Date Released: Monday, December 15, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14339A408 - Beaver Valley, Unit 2, Submittal of the Updated Final Safety Analysis Report, Revision 21. (4 page(s), 11/24/2014)
- ML14339A413 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, List of Effective Pages. (77 page(s), 11/24/2014)
- ML14339A414 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 1, Introduction and General Description of Plant. (337 page(s), 11/24/2014)
- ML14339A415 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 2, The Site, Part 1 of 2. (723 page(s), 11/24/2014)
- ML14339A416 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 2, The Site, Part 2 of 2. (650 page(s), 11/24/2014)
- ML14339A417 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 3, Design of Structures, Components, Equipment, and Systems, Part 1 of 2. (537 page(s), 11/24/2014)
- ML14339A418 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 3, Design of Structures, Components, Equipment, and Systems, Part 2 of 2. (553 page(s), 11/24/2014)
- ML14339A410 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 4, Reactor. (267 page(s), 11/24/2014)
- ML14339A411 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 5, Reactor Coolant System and Connected Systems. (233 page(s), 11/24/2014)
- ML14339A412 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 2, Engineered Safety Features. (511 page(s), 11/24/2014)
- ML14339A420 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 7, Instrumentation and Controls. (470 page(s), 11/24/2014)
- ML14339A431 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 8, Electric Power. (172 page(s), 11/24/2014)
- ML14339A433 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 9, Auxiliary Systems. (701 page(s), 11/24/2014)
- ML14339A434 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 10, Steam and Power Conversion System. (186 page(s), 11/24/2014)
- ML14339A429 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 11, Radioactive Waste Management. (188 page(s), 11/24/2014)
- ML14339A430 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 12, Radiation Protection. (160 page(s), 11/24/2014)
- ML14339A435 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 13, Conduct of Operations. (34 page(s), 11/24/2014)
- ML14339A437 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Chapter 14, Initial Test Program. (162 page(s), 11/24/2014)
- ML14339A438 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 15, Accident Analysis. (471 page(s), 11/24/2014)
- ML14339A439 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 16, Technical Specifications. (5 page(s), 11/24/2014)
- ML14339A440 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 17, Quality Assurance. (3 page(s), 11/24/2014)
- ML14339A453 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 18, Human Factors Engineering. (6 page(s), 11/24/2014)
- ML14339A454 - Beaver Valley, Unit 2, Updated Final Safety Analysis Report, Revision 21, Section 19, Managing the Effects of Component Aging. (61 page(s), 11/24/2014)
- ML14339A451 - Beaver Valley, Unit 2, Licensing Requirements Manual (LRM), Revision 81. (256 page(s), 11/24/2014)
- ML14339A452 - Beaver Valley, Units 1 and 2, Technical Specification Bases Update Status, Revision 27. (686 page(s), 11/24/2014)
- ML14339A455 - FirstEnergy Nuclear Operation Company, Quality Assurance Program Manual, Revision 19. (36 page(s), 11/24/2014)