Home > NRC Library > ADAMS Public Documents
FOIA/PA-2014-0245 - Resp 1 - Final.
Accession Number: ML14209A974
Date Released: Wednesday, July 30, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14209A955 - FOIA/PA-2014-0245 - Resp 1 - Final. (2 page(s), 7/22/2014)
- ML14209A952 - FOIA/PA-2014-0245 - Resp 1 - Final. Group A (Records Already Publicly Available). (12 page(s), 7/22/2014)
- ML070710241 - IR 05000455-07-007 on 02/05/2007 - 02/09/2007 for Exelon Generation Company, Byron Station, Unit 2; Supplemental Inspection for a White Performance Indicator in the Mitigating Systems Cornerstone. (16 page(s), 3/9/2007)
- ML090510703 - IR 05000454-09-006, 05000455-09-006 on 01/20/09 - 01/03/09 for Byron, Units 1 and 2, Supplemental Inspection - Inspection Procedure (IP) 95001. (24 page(s), 2/20/2009)
- ML091330819 - IR 05000454-09-002, 05000455-09-002; on January 1, 2009 - March 31, 2009; Byron Station, Units 1 & 2; Maintenance Risk Assessments and Emergent Work Controls, and Operability Evaluations. (40 page(s), 5/13/2009)
- ML083180104 - IR 05000454-08-009(DRS); 05000455-08-009(DRS); 10/06/2008 through 10/10/2008; Byron Station, Units 1 and 2; Identification and Resolution of Problems. (19 page(s), 11/12/2008)
- ML081260359 - IR 05000454-08-008, 05000455-08-008 on 03/28/2008 for Byron Station, Units 1 and 2, Routine Inspection. (11 page(s), 5/5/2008)
- ML090420213 - IR 05000454-08-005, 05000455-08-005; Exelon Generation Company, LLC; October 1 - December 31, 2008; Byron Station, Units 1 & 2; Refueling and Other Outage Activities, and Access Control to Radiologically Significant Areas. (49 page(s), 2/10/2009)
- ML083190592 - IR 05000454-08-004, 05000455/2008004, on July 1, 2008 - September 30, 2008, Byron Station, Units 1 and 2; Fire Protection, Maintenance Effectiveness; Operability Evaluation. (42 page(s), 11/13/2008)
- ML082270712 - IR 05000454-08-003; 05000454-08-003, on April 01 2008 - June 30, 2008, Byron Station, Units 1 and 2; Fire Protection, Inservice Inspection Activities, Maintenance Effectiveness and Maintenance Risk Assessments and Emergent Work Control. (76 page(s), 8/14/2008)
- ML081350248 - IR 05000454-08-002, 05000455-08-002, on 01/01/2008 - 03/31/2008, Byron Station, Units 1 and 2; Access Control to Radiologically Significant Areas, Problem Identification and Resolution. (7 page(s), 5/14/2008)
- ML071980204 - IR 05000454-07-502; 05000455-07-502; on 06/18/2007-06/22/2007; Byron Station, Biennial Emergency Preparedness Exercise Baseline Inspection. (12 page(s), 7/12/2007)
- ML073540538 - IR 05000454-07-405 (DRS); 05000455-07-405 (DRS); on 10/29/2007 - 11/02/2007; Byron Station; Routine Security Baseline Inspection - Cover Letter. (5 page(s), 12/14/2007)
- ML072250239 - IR 05000454-07-404(DRS); 05000455-07-404(DRS); 01/17/2007 - 01/19/2007; 07/09/2007 - 07/11/2007; Byron Station; Routine Security Baseline Inspection - Cover Letter. (6 page(s), 8/8/2007)
- ML072211001 - IR 05000454-07-402, and IR 05000455-07-402, 06/04/2007 - 06/27/2007, Byron Station, Units 1 and 2, Material Control and Accounting Program - Cover Letter. (5 page(s), 8/8/2007)
- ML080520498 - IR 05000454-07-009(DRS) and 05000455-07-009(DRS), on 10/23/2007 - 02/14/2008, Byron Station, Units 1 and 2; Special Inspection to Evaluate the Facts and Circumstances Surrounding the Degradation of the Essential Service Water Riser Piping to the Cooling. (80 page(s), 2/21/2008)
- ML080440368 - IR 05000454-07-005, 05000455-07-005, on 10/01/2007 - 12/31/2007; Byron Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Operability Evaluation. (49 page(s), 2/13/2008)
- ML073180599 - IR 05000454-07-004; on 05000455-07-004; 07/01/2007-09/30/2007; Byron Station, Units 1 and 2; Maintenance Effectiveness, Post-Maintenance Test, Component Design Bases Inspection. (41 page(s), 11/14/2007)
- ML072211020 - IR 05000454-07-003 and 05000455-07-003; on 03/01/2007 - 06/30/2007; Byron Station, Units 1 and 2; Fire Protection, Inservice Inspection Activities, Operability Evaluations, and Refueling and Outage Activities. (64 page(s), 8/8/2007)
- ML071350661 - IR 05000454-07-002; 05000455-007-002; on 01/01/2007-03/31/2007; Byron Station, Units 1 and 2; Equipment Alignment and Fire Protection. (41 page(s), 5/15/2007)
- ML070120571 - IR 05000454-06-009; 05000455-06-009(DRS) on 10/30/2006 - 12/01/2006 for Byron Station; Component Design Bases Inspection. (43 page(s), 1/12/2007)
- ML062160546 - IR 05000454-06-008 (DRS); 05000455-06-008 (DRS); 06/19/2006 - 06/22/2006; Byron Station, Units 1 and 2; Access Control; Owner-Controlled Area Controls and Performance Indicator Verification SGI Cvr Ltr. (5 page(s), 8/2/2006)
- ML062540414 - IR 05000454-06-007(DRS) and IR 05000455-06-007(DRS); 01/30/06-02/02/06; Exelon Nuclear Corporate, Mid-West ROG Headquarters; 08/14/06-08/18/06; Byron, Units 1 & 2. Security Review of Security Training and Fitness-for-Duty; Event Follow-up; Cover Ltr. (7 page(s), 9/8/2006)
- ML070430564 - IR 05000454-06-005, 05000455-06-005; 10/01/2006-12/31/2006; Byron Station, Units 1 and 2; Identification and Resolution of Problems. (51 page(s), 2/12/2007)
- ML062150249 - IR 05000454-06-003; 05000455-06-003; 05000454-06-010; 05000455-06-010; on 04/01/2006-06/30/2006; Byron Station, Units 1 and 2; Routine Integrated Inspection Report. (37 page(s), 8/3/2006)
- ML061320518 - IR 05000454-06-002; 05000455-06-002; on 01/01/2006-03/31/2006; Byron Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Identification and Resolution of Problems. (41 page(s), 5/12/2006)
- ML060390424 - IR 05000454-05-011; 05000455-05-011; on 10/01/2005-12/31/2005; Byron Station, Units 1 and 2; Inservice Inspection Activities, Permanent Plant Modification, Emergency Action Level and Emergency Plan Changes. (65 page(s), 2/3/2006)
- ML053070259 - IR 05000454-05-009; 05000455-05-009; on 07/01/2005-09/30/2005; Byron Station, Units 1 and 2; Maintenance Effectiveness, Refueling & Outage Activities. (31 page(s), 11/2/2005)
- ML052020393 - IR 05000454-05-004; 05000455-05-004, on 04/01/2005-06/30/2005; Byron Station, Units 1 and 2; Adverse Weather, Fire Protection, Surveillance Testing. (43 page(s), 7/20/2005)
- ML051240285 - IR 05000454-05-003; IR 05000455-05-003 on 01/01/2005-03/31/2005 for Byron Station, Units 1 and 2; Post Maintenance Testing, Surveillance Testing, Access Control to Radiologically Significant Areas, Event Followup, Other Activities. (79 page(s), 5/4/2005)
- ML051440451 - IR 05000454-05-002 (DRS); IR 05000455-05-002(DRS); 01/24/2005 - 02/11/2005; Byron Station, Units 1 and 2; Safety System Design and Performance Capability. (38 page(s), 5/20/2005)
- ML050280372 - IR 05000454-04-009, IR 05000455-04-009; on 10/01/2004 - 12/31/2004 for Byron Station, Units 1 & 2; Non-Routine Plant Evolutions, Event Followup. (53 page(s), 1/27/2005)
- ML043270255 - IR 05000454-04-007; IR 05000455-04-007; on 07/01/2004-09/30/2004; Byron Station, Units 1 and 2; Equipment Alignment, Maintenance Effectiveness, Maintenance Risk Assessment, and Temporary Plant Modifications. (67 page(s), 11/8/2004)
- ML042050022 - IR 05000454-04-004; IR 05000455-04-004, on 04/01/2004-06/30/2004; Byron Station, Units 1 and 2; Identification and Resolution of Problems. (57 page(s), 7/20/2004)
- ML063120614 - IR 05000454/2006004; 05000455/2006004; on 07/01/2006 - 09/30/2006; Byron Station, Units 1 and 2; Fire Protection and Radiation Protection. (60 page(s), 11/8/2006)
- ML050390446 - IR 05000266-04-012, IR 05000301-04-012, on 10/01/2004 - 12/31/2004, for Nuclear Management Company, LLC Operability Evaluations and Post Maintenance Testing. (46 page(s), 2/4/2005)
- ML050320365 - IR 05000255-04-012 on 10/01/2004 - 12/31/2004; Palisades Nuclear Plant; Operator Performance During Non-Routine Evolutions & Events; Refueling & Other Outage Activities; Identification & Resolution of Problems; & Other (Temporary Instruction 2515). (94 page(s), 1/31/2005)
- ML090480574 - Exelon Nuclear Announces Executive Realignment. (1 page(s), 2/17/2009)
- ML062330206 - ER 05000454-06-301(DRS), 05000455-06-301(DRS); 06/21/2006 - 06/30/2006; Exelon Generation Company, LLC, Byron Station. Initial License Examination Report. (13 page(s), 8/18/2006)
- ML072610510 - Byron, Units 1 and 2 - Evaluation of Proposed Risk-Informed Request for an Inservice Inspection Program. (9 page(s), 9/25/2007)
- ML061090493 - Byron Annual Assessment Meeting Summary Slides 04/10/2006. (20 page(s), 4/10/2006)
- ML082690569 - 09/16/2008 Meeting Summary for Regulatory Conference (EA-08-197) 91608. (5 page(s), 9/24/2008)
- ML071290248 - 05/08/2007 Byron NRC Presentation EOC Public Meeting Slides. (20 page(s), 5/8/2007)
- ML071560306 - 05/08/2007 - Summary of Public Meeting with Exelon Generation Company Management to Discuss the Byron Station, Units 1 & 2, End-of-Cycle Plant Performance Assessment. (5 page(s), 6/4/2007)
- ML071100250 - 05/08/2007 - Notice of Public Meeting with Exelon Generation Company Re: Byron Station Plant Performance Annual Assessment. (3 page(s), 4/20/2007)
- ML081270263 - 04/24/2008 Byron End-of-Cycle Plant Performance Assessment Meeting Summary. (5 page(s), 5/5/2008)
- ML080720690 - 04/24/2008 - Notice of Significant Meeting Open to the Public with Exelon Generation Company, LLC to Discuss NRC End-of-Cycle Assessment of Byron Station Units 1 and 2 Performances for the 2007 Calendar Year. (2 page(s), 3/12/2008)
- ML051360315 - 04/19/2005 Summary of Public Meeting with Exelon Nuclear Regarding Byron End-of-Cycle Plant Performance Assessment. (5 page(s), 5/11/2005)
- ML050900213 - 04/19/2005 Notice of Public Meeting with Exelon Generation Company, LLC to discuss the Byron End-of-Cycle plant performance assessment. (2 page(s), 3/25/2005)
- ML061100289 - 04/10/2006 Public Meeting Summary, to Discuss the Byron Units 1 & 2 End-of-Cycle Plant Performance Assessment. (5 page(s), 4/19/2006)
- ML060860445 - 04/10/2006 Public Meeting Notice with Exelon Generation Company, LLC to Discuss NRC End-of-Cycle Assessment of Byron Station Units 1 and 2 Performance for the 2005 Calendar Year. (4 page(s), 3/27/2006)
- ML041460173 - April 2004 Monthly Operating Report For Byron Station, Units 1 and 2. (8 page(s), 5/15/2004)
- ML051370316 - April 2005 Monthly Operating Report for Byron Station, Units 1 and 2. (8 page(s), 5/15/2005)
- ML071650509 - Bryon Station, Unit 2, 60-Day Response to NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors." (5 page(s), 6/13/2007)
- ML081830086 - Byron Nuclear Power Station Unit 1 Steam Generator Inservice Inspection Summary Report for Refueling Outage 15. (20 page(s), 6/30/2008)
- ML072120522 - Byron Nuclear Power Station, Unit 2, Steam Generator Inservice Inspection Summary Report for Refueling Outage 13. (1 page(s), 7/31/2007)
- ML101730565 - Byron Station Response to Violation Notice M-2006-02007. (6 page(s), 5/30/2006)
- ML063410367 - Byron Station Unit 1 Sixty-Day response to NRC Order EA-03-009, "Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors". (5 page(s), 12/6/2006)
- ML063410370 - Byron Station Unit 1, 60-Day Response to NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors." (5 page(s), 12/6/2006)
- ML072430688 - Byron Station Unit 2, Relaxation Request from First Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. (28 page(s), 8/30/2007)
- ML053320209 - Byron Station Units 1 And 2 Inservice Inspection Program Relief Request I3R-01 (6 page(s), 11/8/2005)
- ML081490531 - Byron Station, Unit 1 Sixty-Day Response to NRC Order EA-03-009, "First Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." (6 page(s), 5/28/2008)
- ML070180607 - Byron Station, Unit 1, 90-Day Inservice Inspection Report for Interval 3, Period 1, Outage 1 (B1R14). (1 page(s), 1/16/2007)
- ML070230469 - Byron Station, Unit 1, Cycle 15 Core Operating Limits Report, Revision 4. (16 page(s), 1/23/2007)
- ML063000478 - Byron Station, Unit 1, Pressurizer Weld Overlay Examination Results Related to Relief Request I3R-08. (11 page(s), 10/26/2006)
- ML080580263 - Byron Station, Unit 2 - Submittal of Analytical Evaluation of Pressurizer Seismic Restraint Lug Indications. (29 page(s), 1/11/2006)
- ML071070443 - Byron Station, Unit 2 Cycle 14 Core Operating Limits Report. (16 page(s), 4/17/2007)
- ML071730458 - Byron Station, Unit 2, 60-Day Response to First Revised NRC Order EA-03-009, "Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactors Pressure Vessel Heads at Pressurized Water Reactors." (21 page(s), 6/20/2007)
- ML072120474 - Byron Station, Unit 2, 90-Day Inservice Inspection Report for Interval 3, Period 1, Outage 1 (B2R13). (1 page(s), 7/31/2007)
- ML071560272 - Byron Station, Unit 2, Closeout of Confirmatory Action Letter Requirements. (5 page(s), 6/4/2007)
- ML071070447 - Byron Station, Unit 2, Reactor Coolant System (RCS) Pressure and Temperature Limits Reports (PTLR). (26 page(s), 4/17/2007)
- ML070170225 - Byron Station, Unit 2, Response to Request for Additional Information Regarding the Byron Station, Unit 2 Fall 2005 Steam Generator Inspection. (3 page(s), 1/16/2007)
- ML090230326 - Byron Station, Units 1 & 2 - 90-Day Notification Prior to First Storage of Spent Fuel. (1 page(s), 1/23/2009)
- ML071200272 - Byron Station, Units 1 & 2 - Annual Dose Report for 2006. (1 page(s), 4/30/2007)
- ML060330815 - Byron Station, Units 1 & 2 re: Withdrawal of Inservice Inspection Program Relief Request 12R-52. (1 page(s), 2/1/2006)
- ML052660329 - Byron Station, Units 1 & 2, lnservice Inspection Program Relief Request 12R-52. (6 page(s), 9/22/2005)
- ML062300200 - Byron Station, Units 1 & 2, Response to NRC Request for Additional Information to Byron Station Relief Request I3R-08. (32 page(s), 8/18/2006)
- ML081610394 - Byron Station, Units 1 & 2, Submittal of 2008 Byron Initial License Examination Post-Examination Comments. (21 page(s), 6/6/2008)
- ML060460400 - Byron Station, Units 1 and 2 - 2005 Regulatory Commitment Change Summary Report. (5 page(s), 2/15/2006)
- ML061210247 - Byron Station, Units 1 and 2, 2005 Annual Radioactive Effluent Release Report. (101 page(s), 4/30/2006)
- ML071200276 - Byron Station, Units 1 and 2, 2006 Annual Radioactive Effluent Release Report. (95 page(s), 4/30/2007)
- ML061950605 - Byron Station, Units 1 and 2, Groundwater Protection - Data Collection Questionnaire. (4 page(s), 7/14/2006)
- ML070120246 - Byron Station, Units 1 and 2, Inservice Inspection Program Second Interval Relief Requests I2R-21, I2R-22, I2R-23, I2R-25 and I2R-53. (34 page(s), 1/12/2007)
- ML063490286 - Byron Station, Units 1 and 2, Report of Changes, Tests and Experiments. (41 page(s), 12/13/2006)
- ML061180496 - Byron Station, Units 1 and 2, Third 10-Year Inservice Inspection Interval, Relief Request I3R-08, Structural Weld Overlays on Pressurizer Spray, Relief, Safety and Surge Nozzle Safe-ends and Associated Alternative Repair Techniques. (31 page(s), 4/28/2006)
- ML081930790 - Byron, Unit 1, 90-Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15). (109 page(s), 7/11/2008)
- ML083400228 - Byron, Unit 2, 60-Day Response to First Revised NRC Order EA-03-009, "Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." (20 page(s), 12/5/2008)
- ML071240370 - Byron, Unit 2, Pressurizer Weld Overlay Examination Results Related to Byron Station Relief Request 13R-08. (2 page(s), 5/4/2007)
- ML062560349 - Byron, Unit 2, Response to Request for Additional Information Regarding the Fall 2005 Steam Generator Inspection. (11 page(s), 9/8/2006)
- ML061430370 - Byron, Units 1 & 2 - 2005 Annual Radiological Environmental Operating Report and Current Revision of the Plant Offsite Dose Calculation Manual (ODCM). (1 page(s), 5/15/2006)
- ML081270225 - Byron, Units 1 & 2, Transmittal of 2007 Annual Radioactive Effluent Release Report & Rev. 5 to Offsite Dose Calculation Manual. (346 page(s), 4/30/2008)
- ML063530333 - Byron, Units 1 & 2, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval. (141 page(s), 2/14/2006)
- ML070160548 - Byron, Units 1 and 2, 2006 Regulatory Commitment Change Summary Report. (4 page(s), 1/16/2007)
- ML081560649 - Byron, Units 1 and 2, Response to NRC Request Concerning Unresolved Item 05000454/2008008 and 05000455/2008008. (2 page(s), 6/4/2008)
- ML060940186 - Byron, Units 1 and 2, Response to Substantive Cross-Cutting Issue Concerning Human Performance. (3 page(s), 4/3/2006)
- ML063480067 - Commitment Regarding Byron Station Relief Request I3R-08 for Byron Station Unit 2. (3 page(s), 12/14/2006)
- ML050260320 - December 2004 Monthly Operating Report for Byron Station, Units 1 and 2. (8 page(s), 1/14/2005)
- ML050810428 - February 2005 Monthly Operating Report for Byron Station Units 1 and 2. (8 page(s), 3/15/2005)
- ML050460142 - January 2005 Monthly Operating Report for Byron Station Units 1 and 2. (8 page(s), 2/15/2005)
- ML042040314 - June 2004 Monthly Operating Report for Byron Station, Units 1 and 2. (8 page(s), 7/15/2004)
- ML14209A953 - FOIA/PA-2014-0245 - Resp 1 - Final. Group B (Records Being Released in Their Entirety). (6 page(s), 7/22/2014)
- ML14209A954 - FOIA/PA-2014-0245 - Resp 1 - Final. Group C (Records Being Released in Part). (15 page(s), 7/22/2014)