Home > NRC Library > ADAMS Public Documents
Updates Regarding Homestake's Planned Zeolite Water Treatment System In Accordance With the Provisions Outlined in the Proposed Draft Discharge Permit DP-200 Renewal.
Accession Number: ML14206A889
Date Released: Tuesday, August 26, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14206A890 - Updates Regarding Homestake's Planned Zeolite Water Treatment System In Accordance With the Provisions Outlined in the Proposed Draft Discharge Permit DP-200 Renewal. (1 page(s), 7/7/2014)
- ML14206A892 - 1200 GPM Zeolite-Based Uranium Water Treatment System Design Report. (32 page(s), 7/31/2014)
- ML14206A895 - Exhibit 1 - General System Layout. (1 page(s), 6/30/2014)
- ML14206A897 - Exhibit 2 - Major Piping Schematic. (1 page(s), 6/30/2014)
- ML14206A898 - Exhibit 3 - Cross Section Location Map. (1 page(s), 6/30/2014)
- ML14206A899 - Exhibit 4 - Cross Sections Through Cells Cross Section A-A' Through D-D'.. (1 page(s), 6/30/2014)
- ML14206A900 - Exhibit 5 - Cross Sections Through Cells Cross Sections E-E' Through I-I'. (1 page(s), 6/30/2014)
- ML14206A901 - Exhibit 6 - Perimeter Berm and Anchor Trench Liner Details. (1 page(s), 6/30/2014)
- ML14206A902 - Exhibit 7 - Interior Berm Liner Installation. (1 page(s), 5/31/2014)
- ML14206A903 - Exhibit 8 - Water Treatment Pipping with Top of Liner Surface. (1 page(s), 6/30/2014)
- ML14206A904 - Exhibit 9 - Piping, Cell Water Transfer, and Shower Building Details. (1 page(s), 6/30/2014)
- ML14206A905 - Exhibit 10 - Cell Water Supply, Treated Water Discharge and Regen Pumping Cross Section Details. (1 page(s), 6/30/2014)
- ML14206A896 - Exhibit 11 - Tank Installation and Anchorage Detail. (1 page(s), 6/30/2014)