Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3 and VEGP Units 3 and 4 Tier 1, Revision 2.
Accession Number: ML14183A994
Date Released: Monday, August 4, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14183A926 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3 and VEGP Units 3 and 4 Tier 1, Revision 2 (Public Version). (3 page(s), 6/27/2014)
- ML14183B430 - Vogtle Electric Generating Plant Units, 3 and 4, Tier 1, Revision 2. (560 page(s), 5/15/2014)
- ML14183A957 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 1, Introduction and General Description of the Plant. (447 page(s), 5/15/2014)
- ML14183B180 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Table of Contents. (22 page(s), 5/15/2014)
- ML14183B181 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Section 2.0, Site Characteristics. (23 page(s), 5/15/2014)
- ML14183B182 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Section 2.1, Geography and Demography. (23 page(s), 5/15/2014)
- ML14183B183 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Section 2.2. Identification of Potential Hazards in Site Vicinity. (32 page(s), 5/15/2014)
- ML14183B185 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Section 2.3, Meteorology. (124 page(s), 5/15/2014)
- ML14183B189 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.4A, Observation Well Installation and Development Report. (230 page(s), 5/15/2014)
- ML14183B187 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.4B, Groundwater Model Development & Analysis. (141 page(s), 5/15/2014)
- ML14183B188 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Section 2.5, Geology, Seismology, and Geotechnical Engineering. (473 page(s), 5/15/2014)
- ML14183B190 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.5A - Geotechnical Investigation and Laboratory Testing Data Report - ESP. (1 page(s), 5/15/2014)
- ML14183B191 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.5B - High Resolution Compressional Seismic Survey Field Report. (1 page(s), 5/15/2014)
- ML14183B192 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.5C - Geotechnical Investigation and Laboratory Testing Data Report-COL. (1 page(s), 5/15/2014)
- ML14183B193 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.5D - Engineered Fill Below Grade Test Pad, Phase 1. (1 page(s), 5/15/2014)
- ML14183B194 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 2, Site Characteristics, Appendix 2.5E - AP1000 Vogtle Site Specific Seismic Evaluation Report. (93 page(s), 5/15/2014)
- ML14183B222 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 3, Design of Structures, Components, Equipment and Systems, Table of Contents. (26 page(s), 5/15/2014)
- ML14183B223 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 3, Design of Structures, Components, Equipment and Systems, Page Continue. (29 page(s), 5/15/2014)
- ML14183B224 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.2 - Classification of Structures, Components, and Systems - Page Continue. (80 page(s), 5/15/2014)
- ML14183B215 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.3 - Wind and Tornado Loadings - Page Continue. (6 page(s), 5/15/2014)
- ML14183B216 - Vogtle, Units 3 & 4, Updated Final Safety Analysis Report, Revision 3, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.4 - Water Level (Flood) Design - Page Continue. (24 page(s), 5/15/2014)
- ML14183B217 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.5, Missile Protection. (20 page(s), 5/15/2014)
- ML14183B218 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.6, Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (50 page(s), 5/15/2014)
- ML14183B221 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.7, Seismic Design. (111 page(s), 5/15/2014)
- ML14183B226 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.8, Design of Category I Structures. (186 page(s), 5/15/2014)
- ML14183B276 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.9, Mechanical Systems and Components. (161 page(s), 5/15/2014)
- ML14183B278 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 5/15/2014)
- ML14183B280 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. (57 page(s), 5/15/2014)
- ML14183B281 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Appendix 3A, HVAC Ducts and Duct Supports. (3 page(s), 5/15/2014)
- ML14183B282 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 5/15/2014)
- ML14183B283 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Appendix 3C, Reactor Coolant Loop Analysis Methods. (4 page(s), 5/15/2014)
- ML14183B285 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 3, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (107 page(s), 5/15/2014)
- ML14183B288 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3E High-Energy Piping in the Nuclear Island. (10 page(s), 5/15/2014)
- ML14183B289 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3F Cable Trays and Cable Tray Supports. (3 page(s), 5/15/2014)
- ML14183B294 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3G Nuclear Island Seismic Analyses. (75 page(s), 5/15/2014)
- ML14183B290 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3GG 3-D SSI Analysis AP1000 at Vogtle Site Using NI15 Model. (35 page(s), 5/15/2014)
- ML14183B292 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3H Auxiliary and Shield Building Critical Sections. (78 page(s), 5/15/2014)
- ML14183B293 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Section 3, Appendix 3I Evaluation for High Frequency Seismic Input. (72 page(s), 5/15/2014)
- ML14183B356 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 4 Reactor. (192 page(s), 5/15/2014)
- ML14183B360 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 5 Reactor Coolant System and Connected Systems. (198 page(s), 5/15/2014)
- ML14183B344 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 6 Engineered Safety Features. (273 page(s), 5/15/2014)
- ML14183B345 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 7 Instrumentation and Controls. (185 page(s), 5/15/2014)
- ML14183B346 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 8 Electric Power. (91 page(s), 5/15/2014)
- ML14183B348 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 9 Auxiliary Systems. (582 page(s), 5/15/2014)
- ML14183B349 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 10 Steam and Power Conversion. (139 page(s), 5/15/2014)
- ML14183B371 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 11 Radioactive Waste Management. (179 page(s), 5/15/2014)
- ML14183B378 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 12 Radiation Protection. (197 page(s), 5/15/2014)
- ML14183B382 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 13 Conduct of Operation. (165 page(s), 5/15/2014)
- ML14183B384 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 14 Initial Test Program. (194 page(s), 5/15/2014)
- ML14183B386 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 15 Accident Analyses. (639 page(s), 5/15/2014)
- ML14183B412 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 16 Technical Specifications. (8 page(s), 5/15/2014)
- ML14183B413 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 17 Quality Assurance. (36 page(s), 5/15/2014)
- ML14183B414 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 18 Human Factors Engineering. (82 page(s), 5/15/2014)
- ML14183B415 - Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Updated Final Safety Analysis Report, Revision 3, Chapter 19 Probabilistic Risk Assessment. (390 page(s), 5/15/2014)