Web Page for FOIA/PA Cases 2013-0213.
Accession Number: ML14154A405
Date Released: Monday, June 16, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13102A065 - FOIA/PA-2013-0213-r - Request that NRC make the said 69 documents publicly available in ADAMS (6 page(s), 4/11/2013)
- ML14135A409 - FOIA/PA-2013-0213 - Resp 3 - Final. (4 page(s), 5/7/2014)
- ML14135A408 - FOIA/PA-2013-0213 - Resp 3 - Final, Group Letter D. Part 1 of 1. (351 page(s), 5/7/2014)
- ML073241045 - Reconsideration of Final Significance Determination Associated with Standby Shutdown Oconee Facility Flood Barrier White Finding. (5 page(s), 11/20/2007)
- ML070610460 - Oconee Appeal Panel Review. Manual Chapter 0609.02 Appeal Panel Review of Oconee Standby Shutdown Facility White Finding (EA-06-199). (12 page(s), 3/1/2007)
- ML100280954 - 01/06/2010 Briefing to the Executive Team on the Oconee Nuclear Station External Flooding Issue. (6 page(s), 1/6/2010)
- ML14077A121 - FOIA/PA-2013-0213 - Resp 2 - Partial. Group B (Records Being Release in Their Entirety), Part 2 of 5. (18 page(s), 2/25/2014)
- ML093080034 - 10/28/09 Slides for Oconee Nuclear Station, Units 1, 2, and 3 - Meeting Slides - External Flood NRC Technical Meeting. (36 page(s), 10/28/2009)
- ML110260443 - Non-concurrence on Oconee Assessment Letter. (39 page(s), 1/28/2011)
- ML100210199 - Oconee, Units 1, 2 and 3 - Additional Information Regarding Postulated External Flood Threat Issues. (9 page(s), 1/15/2010)
- ML14077A123 - FOIA/PA-2013-0213 - Resp 2 - Partial. Group B (Records Being Release in Their Entirety), Part 4 of 5. (14 page(s), 2/25/2014)
- ML100610674 - Oconee, Units 1, 2, & 3, External Flood Revised Commitment Letter. (3 page(s), 2/26/2010)
- ML091030172 - Oconee External Flooding Briefing for Commissioner Jaczko. (10 page(s), 4/9/2009)
- ML091620669 - 06/11/09 Summary of Closed Meeting with Duke Carolina to Discuss External Flooding at Oconee. (6 page(s), 7/9/2009)
- ML100760109 - Generic Failure Rate Evaluation for the Jocassee Dam. (3 page(s), 4/14/2010)
- ML14077A125 - FOIA/PA-2013-0213 - Resp 2 - Partial. (1 page(s), 2/25/2014)
- ML101890803 - 06/29/2010 Summary of Closed Meeting With Duke Energy Carolinas, LLC, to Discuss External Flooding at Oconee. (5 page(s), 7/26/2010)
- ML103430047 - Oconee Nuclear Station, Units 1, 2, & 3, Letter From Duke Energy Carolinas, LLC Regarding External Flood, Response to Request For Additional Information. (37 page(s), 3/5/2010)
- ML11278A173 - Oconee Nuclear Station (ONS), Units 1, 2, and 3, Response to Requests for Additional Information Regarding Necessary Modifications to Enhance the Capability of the ONS Site to Withstand the Postulated Failure of the Jocassee Dam. (2 page(s), 10/3/2011)
- ML101600468 - Oconee, Units 1, 2 & 3, Response to Requested Information on the Protection Against External Flooding Including a Postulated Failure of the Jocassee Dam. (3 page(s), 5/27/2010)
- ML14077A122 - FOIA/PA-2013-0213 - Resp 2 - Partial. Group B (Records Being Release in Their Entirety), Part 3 of 5. (19 page(s), 2/25/2014)
- ML11294A341 - Oconee Nuclear Station (ONS), Units 1, 2, and 3, Response to Requests for Additional Information Regarding Necessary Modifications to Enhance the Capability of the ONS Site to Withstand the Postulated Failure of the Jocassee Dam. (17 page(s), 10/17/2011)
- ML072770775 - Dam Failure Information. (1 page(s), 10/1/2007)
- ML102990064 - NRC Staff Assessment of Duke Energy Carolinas, LLC. Oconee External Flooding Issue (TAC NOS. ME4441, ME4442, and ME4443). (18 page(s), 10/26/2010)
- ML080780143 - IR 05000269-06-016, IR 05000270-06-016, IR 05000287-06-016, on 03/31/2006, Oconee Nuclear Station - Preliminary White Finding. (6 page(s), 8/31/2006)
- ML101750619 - OUO - Communication Plan For Issuance of Confirmatory Action Letter To Duke For Oconee - External Flooding June 2010. (6 page(s), 6/1/2010)
- ML100470053 - Oconee, Units 1, 2, & 3, External Flood, Response to Request for Additional Information. (3 page(s), 2/8/2010)
- ML093380701 - Oconee Nuclear Station, Units 1, 2, and 3, Oconee External Flood Analyses and Associated Corrective Action Plan. (29 page(s), 11/30/2009)
- ML102170006 - Oconee Units 1, 2, & 3, Response to Confirmatory Action Letter (CAL) 2-10-003. (17 page(s), 8/2/2010)
- ML091760072 - NRC Site Visit to the Oconee Nuclear Station on June 15, 2009. (10 page(s), 6/25/2009)
- ML103410042 - Supplement to Technical Basis for Allowing Oconee Nuclear Station to Remain in Operation Through November 2011, Associated with the External Flooding Issues. (14 page(s), 3/5/2011)
- ML12026A254 - Communication Plan for OCO GI-204. (8 page(s), 1/31/2012)
- ML090570117 - Oconee Flood Protection and the Jocasse Dam Hazard Basis for NRC Allowing Continued Operation. (9 page(s), 8/12/2009)
- ML061180451 - IR 05000269-06-002, IR 05000270-06-002, IR 05000287-06-002, 01/01/2006 - 03/31/2006; Oconee Nuclear Station, Units 1, 2, and 3; Other Activities. (32 page(s), 4/28/2006)
- ML14077A120 - FOIA/PA-2013-0213 - Resp 2 - Partial. Group B (Records Being Release in Their Entirety), Part 1 of 5. (19 page(s), 2/25/2014)
- ML092940769 - 05/11/2009 Summary of Closed Meeting with Duke Energy Carolinas, LLC, to Discuss Preliminary Results of the Recent Inundation and Sensitivity Studies Concerning Failure of the Jocassee Dam and Resultant Flooding at Oconee Nuclear Station, 1, 2, and 3. (5 page(s), 11/10/2009)
- ML072770777 - Questions and Answers Related to Oconee Flood Barrier. (1 page(s), 10/1/2007)
- ML090680737 - 12/04/09 Summary of Closed Meeting to Discuss the Duke Energy Carolinas, LLC., 09/26/08 Response to NRC's, August 15, 2008 50.54(f) Letter on External Flooding at Oconee. (9 page(s), 3/13/2009)
- ML070590329 - Manual Chapter 0609.02 Appeal Panel Recommendations (Oconee Reply to a Notice of Violation and White Finding (EA-06-199)). (14 page(s), 2/22/2007)
- ML14077A124 - FOIA/PA-2013-0213 - Resp 2 - Partial. Group B (Records Being Release in Their Entirety), Part 5 of 5. (48 page(s), 2/25/2014)
- ML092710344 - Site Visit Observation on 09/25/2009 by Joel Munday for Oconee. (2 page(s), 9/25/2009)
- ML071580259 - Consideration of New Information Associated with a Final Significance Determination for a White Finding - Oconee NS. (3 page(s), 6/22/2007)
- ML090820470 - 05/11/2009 Notice of Forthcoming Closed Meeting with Duke Energy Carolinas, LLC, to Discuss Sensitivity Studies Concerning Failure of the Jocassee DAM & Resultant Flooding at the Oconee Nuclear Station, Unit 1, 2, & 3. (3 page(s), 4/22/2009)
- ML070440337 - Letter from Duke Energy Requesting that the NRC Consider the Seismic Fragility Study. (3 page(s), 2/5/2007)
- ML13163A005 - FOIA/PA-2013-0213 - Resp 1 - Partial. (3 page(s), 6/10/2013)
- ML12058A236 - 02/23/12 Summary of a Teleconference between the U.S. NRC and Duke Energy Regarding Comments made by Duke Energy Concerning the Issuance of the Screening Analysis Report for Generic Issue 204. (4 page(s), 3/5/2012)
- ML11229A710 - G20110617/EDATS: OEDO-2011-0572 - Kathleen Blake E-mail re: Briefing Package for Visit to Oconee Nuclear Power Plant on September 12-13, 2011 (3 page(s), 8/16/2011)
- ML082390669 - E-mail Re: Oconee Nuclear Station - Kick off for Risk Analysis of the Failure of the Jocassee and Keowee Dams to Assess the Potential Effects on the Safe Shutdown Facility of ONS. (12 page(s), 8/26/2008)