Home > NRC Library > ADAMS Public Documents
LaSalle, Units 1 & 2, Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 20.
Accession Number: ML14113A099
Date Released: Tuesday, July 15, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14113A120 - LaSalle, Units 1 & 2, Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 20. (20 page(s), 4/11/2014)
- ML14113A082 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective Pages. (171 page(s), 4/11/2014)
- ML14113A083 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of Plant. (50 page(s), 4/11/2014)
- ML14113A084 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 2.0, Site Characteristics. (532 page(s), 4/11/2014)
- ML14113A085 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 2.0, Figures 2.1-1 through Figure 2.5-19., Sheet 39. (131 page(s), 4/11/2014)
- ML14113A086 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 2.0, Figure 2.5-19., Sheet 40 through Figure 2.5-92. (380 page(s), 4/11/2014)
- ML14113A089 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems. (200 page(s), 4/11/2014)
- ML14113A090 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety Features. (549 page(s), 4/11/2014)
- ML14113A091 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 7.0, Instrumentation and Control Systems. (642 page(s), 4/11/2014)
- ML14113A092 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric Power. (146 page(s), 4/11/2014)
- ML14113A093 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary Systems. (309 page(s), 4/11/2014)
- ML14113A094 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Figure 9.1-1 through Figure 9.4-1. (20 page(s), 4/11/2014)
- ML14113A110 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 10.0, Steam and Power Conversion. (56 page(s), 4/11/2014)
- ML14113A112 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 11.0, Radioactive Waste Management. (139 page(s), 4/11/2014)
- ML14113A114 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 13.0, Conduct of Operations. (43 page(s), 4/11/2014)
- ML14113A115 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 14.0, Initial Test Program. (6 page(s), 4/11/2014)
- ML14113A116 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident Analyses. (436 page(s), 4/11/2014)
- ML14113A117 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 16.0, Technical Specifications. (2 page(s), 4/11/2014)
- ML14113A118 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 17.0, Quality Assurance. (3 page(s), 4/11/2014)
- ML14113A119 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Appendix A. (539 page(s), 4/11/2014)
- ML14113A132 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Technical Requirements Manual. (774 page(s), 4/11/2014)
- ML14113A133 - LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases. (745 page(s), 4/11/2014)