Home > NRC Library > ADAMS Public Documents
Diablo Canyon Unit 2 - Inservice Inspection Program Relief Request SWOL-REP-1 U2 for Approval of an Alternative to the ASME Code, Section Xl, for Preemptive Full Structural Weld Overlays.
Accession Number: ML14101A245
Date Released: Monday, April 21, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14101A246 - Diablo Canyon Unit 2 - Inservice Inspection Program Relief Request SWOL-REP-1 U2 for Approval of an Alternative to the ASME Code, Section Xl, for Preemptive Full Structural Weld Overlays. (47 page(s), 4/7/2014)
- ML14101A247 - AREVA Calculation No. 32-9221080-000, "Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis." (50 page(s), 3/28/2014)
- ML14101A248 - AREVA Calculation No. 32-9221082-000, "Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis." (50 page(s), 3/28/2014)
- ML14101A249 - AREVA Calculation No. 32-9219780-000, "Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzle Weld Overlay Structural Analysis." (109 page(s), 3/26/2014)
- ML14101A250 - AREVA Calculation No. 32-9219813-000, "Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzle Weld Overlay Residual Stress Analysis." (33 page(s), 3/26/2014)
- ML14101A251 - AREVA Calculation No. 32-9219781-000, "Diablo Canyon Unit 2 - Pressurizer Spray Nozzle Weld Overlay Structural Analysis." (111 page(s), 3/26/2014)
- ML14101A252 - AREVA Calculation No. 32-9219792-000, "Diablo Canyon Unit 2 Pressurizer Spray Nozzle Weld Overlay Residual Stress Analysis." (29 page(s), 3/26/2014)
- ML14101A253 - Conclusions of a Third Party Review of AREVA Calculations. (12 page(s), 4/1/2014)