June 5/6/7, 2013 Annual PWR & BWR Materials Meeting Presentations.
Accession Number: ML13161A186
Date Released: Thursday, June 13, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13161A386 - 01- MRP Update, June 2013. (27 page(s), 6/7/2013)
- ML13161A388 - 02- BWRVIP Overview for NRC, June 2013. (39 page(s), 6/7/2013)
- ML13161A390 - 03- NDE Program Update - June 5, 2013. (19 page(s), 6/5/2013)
- ML13162A098 - 04- PWROG MSC Overview June 2013. (12 page(s), 6/5/2013)
- ML13142A183 - June 5-7, 2013 Notice of Forthcoming Annual Materials Programs Public Meeting to Discuss both Pressurized Water Reactor and Boiling Water Reactor Technical Issues. (6 page(s), 5/23/2013)
- ML13162A102 - 05- PSCR Overview June 2013. (35 page(s), 6/7/2013)
- ML13162A104 - 06- Industry Welding Update. (47 page(s), 6/6/2013)
- ML13162A119 - 07- NIFG Update - June 5, 2013. (34 page(s), 6/5/2013)
- ML13162A132 - 08- Team Scanning, NRC June 2013. (15 page(s), 6/5/2013)
- ML13162A140 - 09- Notable Failures in Nondestructive Testing, NRC June 5, 2013. (19 page(s), 6/5/2013)
- ML13162A146 - 10- UT in Lieu of RT, NRC June 2013. (18 page(s), 6/5/2013)
- ML13162A571 - 11- EPRI Irradiated Materials Testing Programs, June 2013. (35 page(s), 6/7/2013)
- ML13162A573 - 12- PWR Reactor Internals, June 2013. (14 page(s), 6/7/2013)
- ML13162A574 - 13- MRP-227-A Slides, NRC June 5, 2013. (13 page(s), 6/5/2013)
- ML13162A577 - 14- LR-ISG-2011-04, NRC June 2013. (4 page(s), 6/5/2013)
- ML13162A592 - 15- Alloy 690 PWSCC, NRC, June 6, 2013. (15 page(s), 6/6/2013)
- ML13162A595 - 16- Alloy 690 PWSCC EPRI, June 2013. (20 page(s), 6/7/2013)
- ML13162A598 - 17- Stainless SCC Where Next, NRC June 2013. (23 page(s), 6/6/2013)
- ML13162A602 - 18- PWROG MSC SS Guidance Update 2013. (8 page(s), 6/6/2013)
- ML13162A608 - 19- Non-standard Alloy 600 Locations, June 6, 2013. (12 page(s), 6/6/2013)
- ML13162A613 - 20- WRS update, NRC, June 5-7, 2013. (19 page(s), 6/6/2013)
- ML13162A623 - 21- xLPR update, NRC, June 5-7, 2013. (16 page(s), 6/6/2013)
- ML13162A644 - 22- Peening, MRP-335R1 SE Update - June 5-7, 2013. (17 page(s), 6/6/2013)
- ML13162A648 - 23- EWR - Mitigation - Excavate and Weld Repair. (31 page(s), 6/6/2013)
- ML13162A651 - 24 - Appendix G, PTS, June 6, 2013. (9 page(s), 6/6/2013)
- ML13162A654 - 25a- Update on MRP Activities Re D3T2 RPV June 6, 2013. (28 page(s), 6/6/2013)
- ML13162A656 - 25b- Update on MRP Appendix G Work, June 6, 2013. (9 page(s), 6/6/2013)
- ML13162A661 - 25c- Update on PSSP project June 2013. (17 page(s), 6/6/2013)
- ML13162A684 - 26- BMP Presentation, NRC June 2013. (10 page(s), 6/6/2013)
- ML13162A730 - 27- EPRI EAF Activities. (12 page(s), 6/6/2013)
- ML13162A747 - 28- X-750, XM-19 Project, June 5-7, 2013. (22 page(s), 6/7/2013)
- ML13162A754 - 30- Weld Residual Stress Control, NRC June 7, 2013. (17 page(s), 6/7/2013)
- ML13162A758 - 33- NRC Position on ASME Code June 7, 2013. (15 page(s), 6/7/2013)